To: Jeffrey Epsteingeevacation©gmail.com]
From: brice gordon
Sent Sat 5/19/2012 2:18:37 PM
Subject: Fwd: Zorro New Well Drilling, (Well K)
as requested
----- Forwarded message
From: brice gordon <MM>
Date: Wed, May 16, 2012 at 9:31 AM
Subject: Zorro New Well Drillin Well K
To: Craig Martin , Rich Kahn
Cc: Zorro Ranch
Well Drilling
the only thing at this time that is not included in bid is
800 ft of control wire for well operation
800 ft of wire to power well
800 ft of pipe
the plan is to rest well 4 for a period of time, to test new well.
In doing so we would disconnect well 4 controls and wire in new well controls.
This would cut back on cost of purchasing well controls at this time.
please controls are for on and off operation of well and distribution pumps
Maybe in the future a separate control panel could be installed
Wire and pipe estimates would be rough, pump size is determined after drilling is done
I will estimate for best case scenario for 100 gpm pump
please note new well needs to be operational and tested by jan 15 2013, due to the fact that by Jan
15 2014 we have to prove/use 25% of the 68 afa permitted allotment.
The dates are firm and are part of a settlement agreement with the WRD, NM
If the well is drilled by end ofjune, this will only leave 3 months at best for testing.
any questions or concerns please advise
Brice Gordon
Little Saint James
USVI
Phone:
EFTA_R1_00299452
EFTA01884602
Brice Gordon
Little Saint James
USVI
Phone:
EFTA_R1_00299453
EFTA01884603
ℹ️ Document Details
SHA-256
d4c4b227ff99ce1ded52bf8a48c30d05f0fea1a986508ebdae500ce1e34bbc0d
Bates Number
EFTA01884602
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0