EFTA01849801.pdf

DataSet-10 1 page 206 words document
👁 1 💬 0
📄 Extracted Text (206 words)
Michael J. Glidden Electrical Services 4716 Estate Mafolie #12 St. Tliomas VI 00802 2-6-12 To: Brice Gordon LSJ Re: 5 Palms Quote Breakdown Brice, Per your request regarding my quote for work associated with getting power to the relocated helipad and on to the 5 palms cabana the following is provided. • My quoted price of $76,666.00 breaks down to $54.76/foot. • The final cost for the flagpole pool was $49.91/foot. • The difference between the two primarily being that two 200 amp, 208 volt services are included in the 5 palms and one 200 amp service with only a 50 amp service (info center) were included in the flagpole pool quote. If you would like to establish a written scope of exactly what work is to be required then a more specific proposal can be provided. The bid you have in hand is based on verbal direction given by Gary Kerney and work completed at the flagpole pool. I will gladly offer my time to do a walkthrough with you and put a defined scope in writing from which I can give you a more specific quote. If you have any further questions please contact me at 340-344-4808. Thank You, Michael J. Glidden EFTA_R1_00242158 EFTA01849801
ℹ️ Document Details
SHA-256
d548c639364928b28107f5b5ff909a19b3c9f1a2c0806eaa0a37528b0967af30
Bates Number
EFTA01849801
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!