To: jeeyacation©gmail.com[jeevacation©gmail.com]; Jeffrey Epstein[[email protected]]
Cc: Craig Martin
From: Craig Martin
Sent: Mon 4/23/2012 9:29:43 PM
Subject: Staffing Guide
Here is a proposed draw down of staffing. As construction ends we will have to retrain staff to fit
into their new roles.
This does not take into account retraining the boat captains to preform other duties as yet.
Proposed Staffing Guide
May 5th Sept 1st Dec 1 st
Island Managers 2
Head Engineer/ Maintenance 1 1 1
Boat Captains 2 2 2
Boat Mate 1 1 1
Engineering 4 2 2
Maintenance 5 3 2
Head Grounds Man 1 1 1
Landscaping 7 7 5
Housekeeping 4 3 3
Part Time Housekeeping 1 1
Total 25 21 18
F
Jeffery;
Here arc some thoughts on support staffing.
Engineering/Maintenance
For Discussion only;
As discussed most of the islands staffing is now involved in construction not on island
EFTA_R1_00529815
EFTA02023300
maintenance. As the construction winds down the staff in engineering, maintenance and marine
services should have more time to perform their permanent jobs. If we can teach them to multi-
task we should be able to shrink the staff.
Between engineering and maintenance there are currently 9 people. Marine services has 3pp plus
the head engineer position (Arran), makes the total support staff 13pp. This is an extremely
large support staff for the island.
Management is currently looking at the staffing by who is there and how they fit into the
current/new staffing structure. We need a new structure. If you look at the staffing from a
larger/different prospective, though, you would have a smaller staff that is trained in multi
areas. We need more out of the box thinking. To get to this point the current staff might have
to be retrained or replaced. This may take several months to accomplish but could be done.
We need a new org chart in this area.
Examples;
Maybe there is a marine mechanic that is the second boat driver who also runs the RO plant and
is the island mechanic. When the island stops maintaining construction equipment and much of
the equipment leaves the island and there is fewer boats to maintain, this may be possible.
Head Engineer that is also a carpenter or a plant operator.
Painter/ Carpenter/maintenance combined.
Electrician/ plant operator/irrigation (electronic side) technician.
These are just suggestion for discussion, but I think you can see where we could be going.
Structure;
Currently engineering reports to Aaran, maintenance to Brice, marine to both.
Future; There should be one person to handle all. They can then supervise all support staff and
deploy them as needed. Landscaping might want to fall here also.
Areas of work/Buildings. Although this may sound trivial I do not believe the staff should be
spread out in 3 or 4 different buildings. This makes is very difficult to supervise them and to
have them multi task .
Currently, carpentry is in the building by the dock, electricians in the RO building, mechanics in
the shed and management in a separate building. It is almost impossible to manage and
supervise the staff that way.
All the work spaces are over sized and could be smaller and more efficient if redesigned
correctly. I would also avoid walls and use more fencing/windows where possible. You need
to be able to see the staff working.
Example (for discussion)
In the RO building have a carpenter shop, paint, electrical, plumbing and a glass enclosed
managers office. I believe this may fit.
To accomplish this;
Quads would go to dock side building.
EFTA_R1_00529816
EFTA02023301
Storage to dock side building.
Electrical shop to shrink.
Engineering storage to the two empty generator bays.
The proposed new metal building would be a great asset but if you do not want to spend
$250,000 on the building you could;
Clean up current mechanics building.
Throw out much of the material there.
Keep sensitive equipment/machinery in dockside building. There are 3 more containers in that
building using valuable space as well as a large carpenter shop, large marine services shop that
would have to be re purposed/moved/reconfigured.
Larger equipment would be kept in current engineering shed/structure.
These are just some ideas for discussion.
The point is the way the support staff is currently structured will lead to a larger staff than you
want. I believe we should start with making the physical plant more efficient and then reducing
the staff.
Craig
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00529817
EFTA02023302
ℹ️ Document Details
SHA-256
d5e218516e59c13e3238b12ffa00951105a95308716e4e822556a2153f07cdc6
Bates Number
EFTA02023300
Dataset
DataSet-10
Type
document
Pages
3
💬 Comments 0