EFTA00608325
EFTA00608338 DataSet-9
EFTA00608342

EFTA00608338.pdf

DataSet-9 4 pages 536 words document
P17 P23 V16 D4 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (536 words)
a BETTEROADS ASPHALT CORP. Construction Proposal Betteroads Asphalt Corp. March 13, 2015 Little St. James Island Asphalt Pathways Paving Little St. James Island St. Thomas, VI Betteroads As halt Corp. link St. James Island Asphalt Pathways Paring Starch 13. 20Th 1 of 4 EFTA00608338 A 11141111ROADS •SPHALT co... Proposal March 13, 2015 Between the Owner: LSJ Little St. James Island St. Thomas, VI And the Contractor: Betteroads Asphalt Corp. For the Project: Little St. James Island Asphalt Pathways Paving Little St. James Island St. Thomas, VI SCOPE OF WORK: • Prepare and level existing sub base • Eradicate and remove weeds and organic material from existing sub base. • Compact sub base to insure stability • Apply Tack Coat prior to asphalt concrete placement • Place new 2 inch asphalt concrete overlay SPECIAL CONDITIONS: • LSJ will and remove, secure, and replace all stone and other border edges. • LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. • Care will be taken by Betteroads Asphalt Corp. throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and Betteroads Asphalt Corp. will not be responsible for replacement of these damaged areas while implementing normal construction procedures. PROJECT DIMENSIONS: Asphalt Pathways 13000.00 S.Y. TOTAL BASE PRICE: $512,500.00 Link* Si. James Island Asphalt Paihways Paving March 13. 2015 2 of 4 EFTA00608339 A IISTTIMOACIS ASMALT COOP. Project Totals: Name Quantity Unit Cost Unit Total Coat Basic Site Materials & Methods Asphalt Concrete Paving Plant mixed bituminous concrete 15(X) 5287.00 Ton 5430.500.00 Tack Coat 1950 516.00 Gal. 531.20000 Asphalt Concrete Paving Subtotal: 5461.700.00 Basic Site Materials & Methods Subtotal: 5461.700.00 Earthwork Grading Fine grade for slab on grade $37.000.00 LS 537.000.(() Grading Suhtotal: 537.000.00 Earthwork Subtotal: 537.000.110 Company Overhead & Margin Company Overhead Overhead Costs St :.X(11) LS 513.800.00 Company Overhead Subtotal: 513.800.00 Company Overhead & Margin Subtotal: 513.800.00 Grand Total $512,500.00 Little St. James Island Asphalt Pathways Paving March 13. 2015 3of 4 EFTA00608340 A SETTOROS ASNIN.T CORP. OPTIONS (NOT INCLUDED IN BASE PRICE): • Additional Asphalt Concrete Paving will be done at a cost of $300.00 per ton when the quantity of asphalt concrete delivery and placement has exceeded 1,500 tons. • A Change Order is any change to the original plans and/or specifications. All change orders need to be agreed upon in writing, including cost, additional time considerations, approximate dates when the work will begin and be completed, a legal description of the location where the work will be done and signed by both parties. 50% of the cost of each change order will be paid prior to the change, with the final 50% paid upon completion of the change order. Additional time needed to complete change orders shall be taken into consideration in the project completion date. Acceptance of Agreement Witness our hand and seal on this day of 20 . Signed in the presence of: Witness Witness Eason Jeffers, USVI General Manager, BAC Owner Signature Little St. James Island Asphalt Pathways Paving March 13. 2015 4 of 4 EFTA00608341
ℹ️ Document Details
SHA-256
d639cd1c8751f8fe0853cce3ea1a9fb393d679213e3c0e04be697b22663aee52
Bates Number
EFTA00608338
Dataset
DataSet-9
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!