EFTA02605330.pdf
👁 1
💬 0
📄 Extracted Text (203 words)
From: Kyle reavis
Sent: Friday, January 11, 2019 1:31 PM
To:
Subject: Re: Roof designs for Building Connection
the option 2 would tie into both roofs nicely and only two=spots on the existing roof would have to be partially
removed. So ve=y quick and easy.
On Fri, Jan 11, 2019 at 8:40 AM J <[email protected] <mailto:jeevacation@gmai=.com> wrote:
might as well make it bigger a=d fill in whole spaace and redo entire new roof, ??
On Fri, Jan 11, 2019 at 6:57 AM Kyle r=avis mailto wrote:
Good Morning Mr Epstein,
Her= are two roof designs for the building connection an how they can be tied =nto the existing
structures.
Very Res=ectfully,
Kyle Reavis
40=A0 please note
The information=contained in this communication is
confidential, may be attorney-client=privileged, may
constitute inside information, and is intended only for=br>the use of the addressee. It is the property of
JEE
Unauthorized =se, disclosure or copying of this
communication or any part thereof is =trictly prohibited
and may be unlawful. If you have received this
co=munication in error, please notify us immediately by
return e-mail or b= e-mail to [email protected] <mailto:[email protected]> , and
destroy this communication and all copies the=eof,
including all attachments. copyright -all rights reserved
EFTA_R1_01795734
EFTA02605330
ℹ️ Document Details
SHA-256
d64fe18f109a52c9bf192115b9d144ab6bcc7aea162e875d977fc83011c4d6da
Bates Number
EFTA02605330
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0