To:
From: Jeffrey Epstein
Sent: Wed 3/5/2014 4:24:28 PM
Subject: Re: JEGE 908JE wire for Maintenance
yes
On Wed, Mar 5, 2014 at 12:23 PM, wrote:
Jeffrey,
attached is work scope for Boeing Mx visit.
may I have your approval for Rich to Wire 50% payment induction payment?
amount $207,296.00 (this includes the $30,000 labor to remove and replace #1 and
#3 engines)
quick break down:
$98,000 C check
$98,000 for squawks found
$30,000 remove and replace Pod engines
AD/SB due $56,755.00
Parts $56,784.00
is this approved?
thank you,
Larry
Original Message
=
FrOrn: JR Stambaugh
To: Scott Stambaugh jetcare
Cc:
Sent: Wed, Feb 26, 2014 12:11 pm
Subject: Re: JEGE 908JE
Larry,
Here is the revised Induction Invoice and updated SOA.
JR Stambaugh
Accountable Manager
Stambaugh Aviation
CRS#EB1R107K
From: Scott Stambaugh
Sent: Wednesday, February 26, 2014 11:35 AM
To:
Cc: 'JR Stambaugh'
Subject: RE: JEGE 908JE
EFTA_R1_00382818
EFTA01931530
The engine changes are part of the quote, they are listed under the additional fixed costs for the 1 and
3 engines, the R and R, rigging, test runs, as well as all preparation and handling for shipping.
I can remove the battery overhauls, we typically utilize a shop battery here to operate the aircraft
(eliminate battery deterioration if a switch is left on etc... during maintenance) and then we inspect
and deep cycle the ships battery so you go out with a fresh battery.
Scott Stambau h
From
Sent: Wednesday, February 26, 2014 10:33 AM
To:
Subject: Re: JEGE 908JE
Hi Scott,
You can delete the Main Battery overhauls. I didn't see the R&R and related tasks for engines 1 and
3? Is that included, or a separate proposal?
The 100 mhr. cap is good.
Larry
---Original Message
From: Larry Visoski
To: Larry Morrison
Sent: Tue, Feb 25, 2014 2:10 pm
Subject: Fwd: JEGE 908JE
Hi Lar
Does this look accurate ?
Thx
Lar V
Sent from my iPhone
Begin forwarded message:
From: "JR Stambaugh"
Date: February 25, 2014 at 1:36:01 PM EST
To: "Larry Visoskr
Subject: Re: JEGE 908JE
Reply-To: "JR Stambaugh"
Larry,
Please find attached the induction invoice for N9OSJE along with your 2014 SOA. The invoice covers
the 50% induction payment as well as the costs for the Boeing SB Top Kit.
Thanks, and have a great day.
JR Stambaugh
Accountable Manager
Stambaugh Aviation
CRSKEB1R107K
EFTA_R1_00382819
EFTA01931531
From: Larry Visoski
Sent: Tuesday, February 25, 2014 1:19 PM
To: Scott Stambaugh
Cc: JR Stambaugh
Subject: Re: JEGE 908JE
Hello Scott,
I'm planning on bringing the Boeing to Brunswick on Monday, March 3, to start the inspection can you provide
an input depaut invoice for the input money that I need to pay you to get the ball rolling thank you
Larry
Sent from my iPhone
On Feb 19, 2014, at 10:22 AM, "Scott Stambaugh" wrote:
Attached is the pricing for the c check and all ADs. I will put together the
pricing for the additional items Glenn sent and forward that on.
Below is the pricing for the SB kit for compliance with AD 2009-05-03 (SB
727-28A-0128 fuel boost pump GFI relays). These materials for the GFI
kit are not in the C check number in the bid. We have completed about
13 of these modifications already and have the long lead time parts in
stock. So we won't have any lead time issues.
Part Number Description Cost per QTY Total
65C38468-15 TOP KIT $25,900.00 1 $25,900.00
KDAG-X4F-001 GFI RELAYS $2,880.00 8 $23,040.00
61-12905-51 SUPP.HARDWARE $225.00 1 $ 225.00
KIT
BACC4SFN24- CONNECTOR $69.00 3 $207.00
43P6
BACC4SFN24- CONNECTOR $72.03 3 $216.09
43P9
BACC4SFN24- CONNECTOR $72.03 3
43P10 $216.09
From
Sent: Monday, February 17, 2014 10:22 AM
To:
EFTA_R1_00382820
EFTA01931532
Subject: Fwd: JEGE 908JE
Scott,
Please see Glen's additional items to get 908JE through to it's next "C' check after this one.
Larry
-----Original Messy e—
From: Gle
To: jetcar
Sent: Thu, Feb 13, 2014 1:03 pm
Subject: RE: JEGE 908JE
Hi Larry,
I've attached a report listing those items that will not make it to the next check in Feb 2016. These are
items that can be done during the 2A next year or done at Stambaugh as an AWR. Everything else is in
the package I already put together.
Glen
From:
Sent: hursda, Februa 13,
To:
Subject: JEGE 908JE
Hi Glen,
Can you please build me an updated maintenance package for 908JE. Let's look at cleaning it up for24
months if we don't get into anything additional major. We are going to do the no.1 and 3 engines at this
time as well.
Mike Miejer will be contact you for engine information on the 1&3 . It is OK to forward whatever he
requests. Looks like the Boss is willing to dump some money back into the Ole girl.
Call me with any questions or to discuss the package. The aircraft will be going to Stambaugh within the
next week.
Larry
<JEGE C check 2-19-14.xls>
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jcevacationkz:vpail,com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00382821
EFTA01931533
ℹ️ Document Details
SHA-256
d663cadf1a690be4199d71c932144afe3005e6d9a483d3462c336a5a87373974
Bates Number
EFTA01931530
Dataset
DataSet-10
Type
document
Pages
4
💬 Comments 0