EFTA00606399.pdf
📄 Extracted Text (114 words)
9 East 71°` .
Dominik Ziewiec
Sep.01.2008.
Attn: Richard Barnett
Proposal to exchange two glass door window panels.
1. Protection of work area.
2. Removing existing damaged window glass panels.
3. Installing new glass panels.
4. Installing finishing moldings around the glass panels.
5. Repainting to match existing color and finish.
Total cost of labor: $ 500.00
Total cost of material: $ 328.89
Total amount due: $ 828.89
aAjui " TV ,N=1
EFTA00606399
Emad Hanna
From: gmax
Sent: Tuesday, September 02, 2008 12:39 PM
To: Emad Hanna
Subject: Re: Approval
Ok..
On 9/2/08 12:19 PM, "Emad Hanna" < > wrote:
G,
Please provide approval for the attached quote.
Thanks
Emad Hanna
Project Controller
EFTA00606400
ℹ️ Document Details
SHA-256
d79d75b185853122ab5d488652a2e567f126f0082c030fc4b0da25a2516195f8
Bates Number
EFTA00606399
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0