EFTA02397249.pdf
👁 1
💬 0
📄 Extracted Text (816 words)
From: Ann Rodriquez
Sent: Monday, April 13, 2015 6:47 PM
To: jeffrey E.
Subject: Fwd: Barge List
Ann R.
Begin forwarded m=ssage:
From: Bill Hague &=t
<=>Date: April 13, 2015 at 2:29:56 PM AST
To: ann rodri uez
Cc: Rich Kahn Da hne Wallace
, Gene Kral
u : e: G=rge Us
Ok.=nbsp;
1
Rudders must be rem=ved and the lower portion must be renewed to proper dimension. They are wor= to the
point of failure and vibrate badly.
2=
We bought pumps and pulleys we can install but I a= referencing the gear in the aft compartment that is the
hydraulic actuator=and linkage for the rudders
3
&nb=p;The cylinders were damaged at sea due to improper installation and subseq=ent damage from a broken
fitting. The ramp was secured with a safety strap b=t still pulled the top sealing portion out of the cylinder.
The fit o= the mounts needs to be remedied at this time. The cylinders work now but a=e not repairable.
Evaluation while being removed to correct and improve the=mounting is necessary at a minimum.
4
=div> The exhaust was assembled without funding to get the barge=off the dick at the last haulout. It is not
properly assembled or supports n=r is it insulated.
6
=e have new ones but need new mounting hoses
And must be done out o= the water
7
Bearings must be pur=hased. I think SBDD has them
EFTA_R1_01430244
EFTA02397249
8
&n=sp; Inspection and new sacrificial sinks installed.
9
SBDD should provide this but it can be discussed.&=bsp;
10
Machine shop work&n=sp;
SBDD
12
This s=ould be done at the same time the tank is cleaned.
13
Watertight compartments forward would need to be d=watered if breached.
There is no ability to do so at=this time except fit the first two compartments that are joins as one due t= a hole
in the bulkhead.
16
=The gauges for oil and temp and rpm are not accurate. One over temperature a=arm is not working as well.
18
&nb=p; Parts.... As needed by inspection.
</=iv>
Sent from my iPhone
> wrote:
Hey Boscoe,
Please see questions ----?
I need a clear understanding of the=listed items, What parts should we purchase and What can be done
i= house.
1. Rudders. What should be done? =
2. Steering Gear. Did we buy the parts for this?
3. Hydraulic Cy=inders. What need to be done?
4. Exhaust system: What are the=issues?
5. Engine Mounts and alignment. (Ok!)
6. Stuffing boxes/=eals. Install new units: Should we buy the new units?
7. Cutlass be=rings. Do we need to purchase?
8. Engine Cooling Grid Coolers and Z=nks. What need to be done?
9. Bottom Paint and Barrier Coat/ Hull Z=nks. Should we purchase?
10. Engine and marine gear control bracke= work. Do we need to purchase?
2
EFTA_R1_01430245
EFTA02397250
11. Fuel tank clean out. Port and s=arboard. (Ok!)
12. Starboard deck fuel fill adapter replacement. Should we replace or fix?
13. Bilge pumping system forward compartme=ts. What about the forward compartments?
14. Repair existing 24 vo=t alternator and add a second one to port motor. Should we purchase?
<=r>1.S. Inspect and size all hydraulic lines and fittings as needed. (Ok!)
17. Install engine room lighting. (Ok!)
18. Tune and s=rvice both engines and marine gear. ----- Any parts need?
19. Clea= and paint engine room. (Ok!)
DISCLAIMER: The information contained in this e-mail may be privileged,=onfidential, and protected
from disclosure. If you are not the intended rec=pient, you are hereby notified that any dissemination, distribution or
dupl=cation of this communication is strictly prohibited. If you have received t=is communication in error, please notify
the sender immediately
On Monday, April 13, 2015 12:22 PM, Boscoe
wrote:
The following is the list I discussed with Gene at Subbase=Drydock today 4/13/2015.
He is familiar with it and is now submi=ted for your review.
l=spect and Repair the following;
1. Rudders.
2. Steering Gear.
3.=Hydraulic Cylinders.
4. Exhaust system
5. Engine Mounts and alignmen=
6. Stuffing boxes/seals.. Install new units
7. Cutlass bearin=s
8. Engine Cooling Grid Coolers and Zinks
9. Bottom Paint and Barrie= Coat/ Hull Zinks
10. Engine and marine gear control bracket work.
1=. Fuel tank clean out. Port and starboard
12. Starboard deck fuel fill a=apter replacement
13. Bilge pumping system forward compartments
14. R=pair existing 24 volt alternator and add a second one to port motor.
15= Inspect and size all hydraulic lines and fittings as needed.
16. Engin= and marine gear instruments in control tower
17. Install engine room li=hting
18. Tune and service both engines and marine gear.
19. Clean a=d paint engine room.
Timing of work
I have been told&n=sp; this haul out must be done in late April or May as there is scheduled a=d
contracted work reported for this facility during June, July and August. <=r>
Please, respond with any questions you may have.
3
EFTA_R1_01430246
EFTA02397251
=/div>
4
EFTA_R1_01430247
EFTA02397252
ℹ️ Document Details
SHA-256
d7bd43e357af89a447822c37e8d26293fba4efb233429718ac60dbbef7f064dc
Bates Number
EFTA02397249
Dataset
DataSet-11
Type
document
Pages
4
💬 Comments 0