EFTA01024398
EFTA01024401 DataSet-9
EFTA01024403

EFTA01024401.pdf

DataSet-9 2 pages 504 words document
P17 V16 V11 P23 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (504 words)
From: Jermaine Ruan To: Jeffrey Epstein <[email protected]> Subject: Re: LSJ INTERNET Date: Tue, 04 Sep 2018 19:46:30 +0000 Yes Boss I will Regards Jnian On Tue, Sep 4, 2018 at 3:42 PM jeffrey E. <jeevacationggmail.com> wrote: Do it right On Tue, Sep 4, 2018 at 3:09 PM Jennaine Ruan > wrote: Good day All Update LSJ internet I have asked Mr. Earl Thomas of 2 Guys Services (FYI No relation to Liston Thomas who also has assisted on occasion) to assist in troubleshooting the situation for Blue Beach internet service. Earl has worked with VIYA and was one of the engineers that came to assist after the storm. He was shortly released from VIYA but has started his own company. He has knowledge in fiber networking and is willing train me since I have must of the primary tools needed and I did the GSJ fiber run. Our findings are as follows: The run of fiber between the Data Center and the Gym is severely compromised (2 of the 6 strands are broken). The results of this is the operating fiber strands takes the Tower/Gym signal down to the data center for distribution to the rest of island network is operational, but the 314 and 4th strands that take the distributed signal back to the Gym is broken. These strands give the Gym switch actual internet service for the Gym and relay the signal to the Blue Beach. In addition, it also gives the internet signal to the radios that give the Flagpole Pool internet and phones. Ideally, order new multi-mode fiber. Create a proper pull through at the sight where the damage conduit was and terminate on both ends. I have two alternatives for fast service restoration. Option 1: We currently have fiber on site. Let's pull a brand-new run of fiber from the Data Center to the Gym. I, with Earl's guidance, will fix the ends and restore service. Option 2: If the fiber on site is not long enough, we can run enough to reach the area with the line was dug up and pull back from the Gym. Let's pull a brand-new run of fiber from the Data Center to the Gym. I, with Earl's guidance, will fix the ends and restore service. Both options still need a proper pull through box at the site at the breakage. Please note: I do not have a clear 'line of sight' to install radios between Data Center and Blue Beach. Regards EFTA01024401 lruan please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of WE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01024402
ℹ️ Document Details
SHA-256
da00631fcb07dc2384f6e6101ab84b2bf3c7b17646bbbcc2a665e30e1f9e89ee
Bates Number
EFTA01024401
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!