📄 Extracted Text (244 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: ann rodriquez
Subject: Photos - September 16, 2015
Date: Wed, 16 Sep 2015 22:08:35 +0000
Attachments: Park_Trail_seating_(1).JPG; Park_Trail_seating_(2).JPG; Park_Trail_seating_(3).JPG;
Park_Trail_seating_(4).JPG; Park_Trail_seating_(5).JPG; Park_Trail_seating_(6).JPG;
Park_Trail_seating_(7).JPG; Park_Trail_seating_(8).JPG; Park_Trail_seating_(9).JPG;
Park_Trail_seating_(10).JPG; Path_to_Shoreline_(1).JPG; Path_to_Shoreline_(2).JPG;
Path_to_Shoreline_(3).JPG; Path_to_Shoreline_(4).JPG; Path_to_Shoreline_(5).JPG;
Pebble_Beach_(1).JPG; Pebble_Beach_(2).JPG; Pebble_Beach_(3).JPG;
Pebble_Beach_(4).JPG; Pebble_Beach_(5).JPG; Pebble_Beach_(6).JPG;
Pebble_Beach_(7).JPG; Waterfall_cistern_(1).JPG; Waterfall_cistert(2).JPG;
Waterfall_cistern_(3).JPG; MBR_flooring_(1).JPG; MBR_flooring_(2).JPG;
MBR_flooring_(3).JPG; MBR_flooring_(4).JPG; MBR_flooring_(5).JPG;
MBR_flooring_(6).JPG; MBR_flooring_(7).JPG; Kitchen_floor_(1).JPG;
Kitchen_floor_(2).JPG; Kitchen_floor_(3).JPG; Kitchen_floor_(4).JPG;
Kitchen_floor_(5).JPG; Kitchen_floor_(6).JPG; Kitchen_floor_(7).JPG;
Kitchen floor_(8).JPG; Kitchen_floor_(9).JPG; MBR_shower_and_steam_room_(1).JPG;
MBR_sRower_and_steam_room_(2).JPG; MBR_shower_and_steam_room_(3).JPG;
MBR_shower_and_steam_room_(4).JPG; MBR_shower_and_steam_room_(5).JPG;
MBR_shower_and_steam_room_(6).JPG; Cabana_2_shower_(1).JPG;
Cabana_2_shower_(2).JPG; Cabana_2_shower_(3).JPG; MBR_garden_(1).JPG;
MBR_garden_(2).JPG; MBR_garden_(3).JPG; MBR_garden_(4).JPG;
MBR_garden_(5).JPG; MBR_garden_(6).JPG; MBR_garden_(7).JPG;
MBR_garden_(8).JPG; MBR_garden_(9).JPG; MBR_garden_(10).JPG;
MBR_garden_(11).JPG; MBR_garden_(12).JPG; MBR_garden_(13).JPG;
MBR_garden_(14).JPG; Flagpole_Pool_speaker_wires_(1).JPG;
Flagpole_Pool_speaker_wires_(2).JPG; Blue_Beach_fiber.JPG
Greetings Sir,
September 16 photos for your review and comments:
Park Trail seating - in progress
Path to shoreline - additional photos
Pebble Beach - the last of the slab is completely removed - lost a few stones on the handrail - Anna will ask
Omar to repair
Waterfall cistern - block work in progress
MBR flooring - sanding #3 completed - room was cleaned this afternoon and floor left to completely thy - 9/17
will be polyurethane application #1
Kitchen floor - additional photos
MBR shower and steam room - for your review
EFTA00845991
Cabana 2 shower - the missing part arrived this afternoon so Danny E. was able to complete the shower fixture
installation, and Sylvester completed the coral stone tile installation
MBR garden - for your review
Flagpole Pool Speaker wires - buried
Blue Beach fiber - in progress, hole for manhole for fiber dug
Respectfully submitted, Daphne
EFTA00845992
ℹ️ Document Details
SHA-256
daf5874d9f21f30445ba8c9b986fc74e1a0eaf42902fc4447d0441ef58778c80
Bates Number
EFTA00845991
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0