EFTA00804938.pdf

DataSet-9 1 page 105 words document
👁 1 💬 0
📄 Extracted Text (105 words)
LSI Dock Scope of work: Demo and remove the following 1. Existing Dock Bumpers 2. Existing S/S Fasteners Straighten and or Install New Bumper fasteners where needed Remove all existing Bumpers and Paint Dock siding with Epoxy Grey Paint Replace bumpers. LSJ to provide floating dock to perform work Duration: 22 days, 2 Men JSJ Cottage Bathroom Scope of Work Install New Dura Rock in Staff Cottage Bathroom Duration: 3 Days, 2 Men Labor Cost Brian: $300.00 per day @ 25 days = $7500.00 Buck: $120.00 per day @ $25 days = $3000.00 Total Labor Cost: $10,500.00 All material and tools supplied by Owner. EFTA00804938
ℹ️ Document Details
SHA-256
db57f3d1da04dba8b2b95cfede675e15c9c72ce8fe09e285bad25af8d487bef7
Bates Number
EFTA00804938
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!