EFTA01043727
EFTA01043730 DataSet-9
EFTA01043733

EFTA01043730.pdf

DataSet-9 3 pages 923 words document
P17 P19 V16 V11 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (923 words)
From: "Jeffrey E." <[email protected]> To: Ann Rodriquez • Subject: Re: Ken Floyd: VI Paving Date: Fri, 09 Jun 2017 17:58:24 +0000 itemized list assuming no interuptions or privacty needed On Fri, Jun 9, 2017 at 11:55 AM, Ann Rodriquez -4 > wrote: Pm sorry Bossman, You would like for Ken to give us an itemized list with pricing and a timeline from start to finish or you don't want anything at all ? Please advise, Ann R. On Jun 9, 2017, at 1:07 PM, jeffrey E. <jeevacation®gmail.com> wrote: Ask god for price timing. If I do not. One at all On Fri, Jun 9, 2017 at 10:43 AM Richard Kahn < wrote: Richard Kahn Begin forwarded message: From: Ann Rodriquez < Subject: Ken Floyd: VI Paving Date: June 9, 2017 at 12:07:49 PM EDT To: Rich Kahn et > Begin forwarded message: From: Ken Floyd <[email protected]> Date: June 9, 2017 at 11:28:41 AM AST To: Ann Rodriquez Cc: Jermaine Ruan EFTA01043730 Subject: Re: LSJ MAP Good Morning, Ann, Please do not take offense at anything I am writing here, as you asked me to put down my issues in an email. Primarily, because we could not have a correspondence call via phone. It appears we are again at the same place, at a different time. The only difference is the idea of, "Economy of scale", by holding out the possibility of doing GSG as a reason to give a lower price. The idea behind a better price due to increased quantities is logical; if the extra work is included in the schedule of values and Schedule of work. It appears the viability of the project hinges on the ability of the owner to maintain a location of privacy, a position of which I respect and am totally committed. However, requirements such as these do not mix well with expedition and even more important to me, quality. In Civil work, especially involving a product such as asphalt, which needs to be protected from fast running water and standing water in order to last, the underlying surface and water travel need to be addressed prior to application of the final surface course. The roads on both Islands were not cut with that in mind and need some intense mitigation. From the formation of retention ponds to swales and low-water crossings. All of the items will be outlined and a unit cost applied to each activity, which will make any approved changes transparent regarding cost. This will be in our, Speed and Quality come together at a premium and I cannot put together a price based on Speed, Quality, Economy of Scale and maintaining privacy for a project in a piecemeal fashion. I take great pride in performing ow work in the best quality possible. If we perform this work, it will be after an approved price and Project Schedule. In order to provide you with these items, I need to know what issues I will be faced with and the issues which are not negotiable. I have no idea of how often or how much notice is or can be provided regarding when privacy is necessary, but it would be productive to stop work on one island while performing work on the one next door. This is just one proposal. I am going to have to finish up due to other appointments. I hope I did not give the impression I don't want to do your project. The opposite is the truth. Want to do an organized, clean and quality job, nothing less. Sincerely, Ken Floyd On Wed, Jun 7, 2017 at 2:47 PM, Ann Rodriquez < > wrote: Hi Ken, The owner would like to see the turn out of LSJ "Road Paving" before we proceed with GSJ We would like to start LSJ asap. Can you please revisit your bid and give us the best deal possible as we would also like to proceed with GSJ right after our LSJ paving project. Please advise, Ann R. On Jun 7, 2017, at 12:33 PM, Ken Floyd < wrote: Good Afternoon, Both of these sketches are labeled LSG, which I take to mean they are not of GSG. Could I get a scale drawing of the Topo for GSG? Thank you very much, Ken Floyd On Wed, Jun 7, 2017 at 12:11 PM, Jermaine Ruan > wrote: EFTA01043731 With Respect, Kenneth Floyd, Virgin Islands Paving General Manager, STT With Respect, Kenneth Floyd, Virgin Islands Paving General Manager, STT please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01043732
ℹ️ Document Details
SHA-256
db7ac807b7cce9b89b9550c8c0e2abbfc40b41f2354e408e70635d7987f8e06a
Bates Number
EFTA01043730
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!