From: Richard Kahn
To: "Jeffrey E." <[email protected]>
Subject: Florida Windows
Date: Wed, 29 Jun 2016 20:54:54 +0000
Attachments: SAF-Q16-040_-B_Richard_Kahn_Proposal_.pdf; SAF-Q16-040_-
B Richard_Kahn_TakeOff .pdf
Inline-Images: Screenshot_2016-06-29_15.09.20.png; Screenshot_2016-06-29_15.30.04.png;
Screenshot_2016-06-29_15.09.10.png; Screenshot_2016-06-29_15.09.00.png; image003jpg
i know you approved already however i wanted to send you all facts that i am aware of so there are no surprises
1) Window Functionality
currently you have horizontal rollers (see picture 1 below)
unfortunately horizontal rollers are no longer made in wood mahogany
Hartman (original bid from dan labonte and vendor that supplied LSJ) proposed a wood mahogany outswing
casement window (see picture 2 below)
bid was 224,250 before other work, permit fees and gc fees -> projected cost 298,000
Coastal proposed a wood mahogany tilt and turn window (see pictures 3 & 4 below)
Proposal was for windows to tilt and turn in (picture 3) however if you do not like they can tilt and turn out
(picture 4)
Scott from Coastal believes the tilt and turn in is a better design
negotiated bid is 90,000 before other work and permit fees -> projected cost 125,000
2) Next steps
a) wire requested is 50% of materials and permit fees or 32,727.83 along with signed contract
b) shop drawings will be ready in 2 weeks for your review
c) file for permit
d) order windows (12-14 weeks)
e) install windows (2-3 weeks)
Projected completion date November 1 - 15
3) Other contractor work required
Drywall / Stucco repairs
Repaint trim and walls around windows
Protection
Remove any window treatments and put back when completed
Remove any art and furniture
Alarming of new windows
Removal and reinstall of storm shutters
4) Work to be provided by Coastal windows
EFTA00824642
Removal of old and installation of new windows
Bucking / Waterproofing
Rain simulation testing
Scaffolding
Portajon
5) Other Notes
a) Windows will be staged in garage bay at 358 el brillo
b) Windows (interior and exterior) will receive 2 coats of primer and 2 coats of topcoat
c) Hardware for Multipoint lock system (medco or tricoat) - you will choose at time of shop drawings (satin
nickel, oil rubbed finish)
d) Framing currently is 2.5 inches thick and new window frames will be 3 inches thick
e) Currently we do not have screens and they are not proposed in bid
f) Warranty - 1 year on installation and 10 years from manufacturer for failure in workmanship
g) House to be painted after windows are installed (3-4 weeks)
Please advise if ok to proceed
Thank you
PICTURE 1
PICTURE 2
PICTURE 3
PICTURE 4
EFTA00824643
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York NY 10022
tel
fax
cell
Begin forwarded message:
From: Scott Fullwood
Subject: Re: tomorrow apt at 11:00am
Date: June 6, 2016 at 4:10:50 PM EDT
To: Richard Kahn
Please see the attached for your approval.
Questions or concerns please call or reply.
Kind Regards,
Scott Fullwood
Coastid indaws and Doan, LLC.
8300 Resource Drive
West Pahn Beach, FL 33404
cell
office
fax
On Mon, Jun 6, 2016 at 10:59 AM, Richard Kahn > wrote:
great
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
EFTA00824644
New York, NY 10022
tel
fax
cell
On Jun 6, 2016, at 10:27 AM, Scott Fullwood < > wrote:
Richard, Yes lets Proceed at 90K, I will prepare and send you the contract to be approved shortly.
Thank you for the opportunity and a look forward to building our relationship.
Kind Regards,
Scott Fullwood
Coastal !I indent.% and Doors, LLC.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003.jpg>
On Fri, Jun 3, 2016 at 5:56 PM, Richard Kahn < wrote:
Thank you for your reply. Unfortunately the principal is firm at 90,000. Please let me know if we can
move forward at 90k. Thank you and have a nice weekend.
Sent from my iPhone
On Jun 2, 2016, at 2:31 PM, Scott Fullwood <:=I > wrote:
I discounted the total by $2,247.80 Total remaining at $92,187.75 I look forward to your reply and hope
we can do business together.
Kind Regards,
Scott Fullwood
EFTA00824645
Coastal Windows and Doors, LW.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003.jpg>
On Thu, Jun 2, 2016 at 9:54 AM, Scott Fullwood • wrote:
yes I will call you then.
Thank you,
Scott Fullwood
Coastal Windows and Doors, LLC.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
a far
<image003.jpg>
On Thu, Jun 2, 2016 at 9:50 AM, Richard Kahn < > wrote:
ok
can we talk at 11 am?
please advise
thanks
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cell
EFTA00824646
On Jun 2, 2016, at 9:33 AM, Scott Fullwood < > wrote:
Good Morning, I was out of town I'm available this morning to discus if you are.
Kind Regards,
Scott Fullwood
C'oastal Ilintlows and Doors, LLC.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003.jpg>
On Tue, May 31, 2016 at 11:41 AM, Richard Kahn <1 > wrote:
please advise when you are free to review attached
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York NY 10022
tel
fax
cell
On May 10, 2016, at 12:28 PM, Scott Fullwood < > wrote:
Per our Conversation please see the attached proposals and links.
Thank you for your time.
http://bildau.delnewifiang=en
EFTA00824647
http://bildau.de/new/?page_id=456&lang=en
Kind regards,
Scott Fullwood
Coastal Windows and Doors, LLC.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003.jpg>
On Tue, May 10, 2016 at 10:44 AM, Richard Kahn wrote:
please let me know when is a good time to review attached with you today
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York NY 10022
tel
fax
cell
On May 9, 2016, at 6:28 PM, Scott Fullwood < > wrote:
Proposal SAF-Q16-040 -B = Full Replacement Proposal.
Please call or reply with nay questions.
Best Regards,
EFTA00824648
Scott Fullwood
Cousta/ lfindows am/ Doors, Lit.
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003.jpg>
On Mon, May 9, 2016 at 6:27 PM, Scott Fullwood < > wrote:
Thank you for your time, Please see the attached proposal, please review and call with
any questions or concerns.
I look forward to your reply.
Proposal SAF-Q16-040 -A = Partial Replacement Proposal
Full Replacement Proposal to be sent in the next e-mail.
Kind Regards,
Scott Fullwood
Coastal Itendows and Doors, LLC
8300 Resource Drive
West Palm Beach, FL 33404
cell
office
fax
<image003 jpg>
On Mon, May 9, 2016 at 12:36 PM, < wrote:
EFTA00824649
I will have it to you by the end of the day.
Thank you,
Scott Fullwood
Sent from my iPhone
On May 9, 2016, at 12:01 PM, Richard Kahn > wrote:
any update on proposal?
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York NY 10022
On May 2, 2016, at 9:48 AM, Scott Fullwood ca wrote:
We should be able to review proposal by May 10th at the latest.
Kind regards,
Scott Fullwood
Coastal Windows and Doors, LLC
8300 Resource Drive
West Palm Beach, FL 33404
<image003.jpg>
EFTA00824650
On Sun, May 1, 2016 at 12:39 PM, Richard Kahn
wrote:
Thank you for coming by to review windows
Please advise when your bid may be ready for review and discussion
Thank you
On 4/28/16, 3:35 PM, "Scott Fullwood" > wrote:
<SAF-Q16-040 -B Richard Kahn Proposal .pdf><SAF-Q16-040 -B Richard Kahn
TakeOff .pdf>
<SAF-Q16-040 -A Richard Kahn Proposal .pdf><SAF-Q16-040 -A Richard KahnTake Offl
.pdf><SAF-Q16-040 -B Richard Kahn Proposal .pdf><SAF-Q16-040 -B Richard Kahn
TakeOff .pdf>
<SAF-Q16-040 -B Richard Kahn DISCOUNT .pdf>
EFTA00824651
ℹ️ Document Details
SHA-256
dca88307926c058a40a57283df74bcf52f7b7a6c81bc7671789e835ca9c15f9f
Bates Number
EFTA00824642
Dataset
DataSet-9
Type
document
Pages
10
💬 Comments 0