EFTA01114004
EFTA01114006 DataSet-9
EFTA01114017

EFTA01114006.pdf

DataSet-9 11 pages 2,110 words document
P17 P23 D6 V15 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (2,110 words)
Permit #230-09 LSJ Project #1004 LSJ Project Name -Master Bedroom I) LSJ Personnel re imtnary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR No. 230-09 BUILDING PERMIT DM0 ,:uno I GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DIVISION OP PlinhisTS mina F KING TIOMINM BUIIDING AM I WON FAX CHAIII Or IF. AMNLIL, SI mow , . v PERMISSION IS HEREBY GRANTED TO Jetirey gpnleln TO (Consfluct INNA.AIC I Renovnt Jon 6 Add It Ion Description of structure: 8" Bike w/ Stone Minich Location: Mitt le St. /ruses; Approximate cost of woo*: S 191,1)3.90 Person(s) In chaise of work: Undecided REMARKS: Contraction shell be done In accorsionee pith TIM. 29, action 292 oL the V.L. Building Code FEE: $ 423-00 teen kit 41- Olt era. Torritorla; Director CommIssionoi el Planning and NaNtal Resoucces EFTA01114006 LSJ Permit #265-10 LSl Project # 1006 LSJ Project Name - Laundry 1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR No. De-811:0281.1.0.-- Date.0(230114_____. BUILDING PERMIT GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DIVISION OF PERMITS 45M a Treacrucksted. SI CMIX 00840 Cynl T. SI I ma 00802 TN Fox Tel Fax PERMISSION IS HEREBY GRANTED TO: • LSJ. LLC TO (Construct, Repair, etc.):Stclicn Renpvatioriandla8ndry Acklbon _ Description of structure:_AAPer APPreYed_PJACit_ Location: LIMO St. JaM0STRFIISS Approximate cost of work: $187480.08 Person(*) In charge of work: TBD REMARKS:.AS_Efm-LK1009 LVISzlelills29 Comalmace FEE:$0,00 usnits. war S09 4.0.44Pin.g a la la, COO EFTA01114007 Permit #265-10 1.51 Project # 1007 LSJ Project Name -Kitchen I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR No. a Date . BUILDING PERMIT GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DWISION Of PERMITS FS Cy SI Felt kract Tot Fax ISM PERMISSION IS HEREBY GRANTED TO: • I Ski. TO (Construct, Repair, etc.):_StagagaRegfatalmrtand_LagndetAgglign Description of structure:_As POI Aooroyee_Oana Location:, _LAM St. Jenhal*nd Approximate cost of work:, StEty.010,00 Person(s) in charge of work: TOO REMARKS:. Aereffie_209nil Colle_TOtaCDMPlinaCe EFTA01114008 Permit # 117-11 LSJ #Project -1011 Main House (Cabana) 1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR Date 08/26/2011 • AMU_ BUILDING PERMIT GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DIVISION OF PERMITS 45 MwthatsfAils4 . emetriiii040 at: Tel: Fax: Tel: CYl t Fax: PERMISSION IS HEREBY GRANTED TO: LA fit: TO (Construct, repair, *Icy Addition-Cabonna Description of structure: As Per APPrered Plans Location: Ma "C" Little St James 123,06400 Approximate cost of work. Person(s) In charge of work: TBD Code Compliance: * * Asper amendment REMARKS: As per *MC 2009 and VI Code 71de 29, Ch. 5 in Ad 7075, petrol!for the installwion ofsolar thermal vstest is not repaired 34&40 FEE: S tormilerrorind MM.. Resou s EFTA01114009 Permit #CN 1049 I LSJ Project 1013 I LSJ Project Name - Flagpole Pool 1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Ins ction Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR No. _Ott 1049_ Date Fab. 7. 2011 BUILDING PERMIT GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES OMSION Of PERMITS AMed FIK Ttrl. PERMISSION IS HEREBY GRANTED TO' L SA II C TO (Construct, Repair, etc.): C0IMMtrool wi Cabana, Desk A Lauprotallo % om Description of structure:J prots Location: PendaSL_Jarno 'Vann Approximate coat of work: $383 300.00 Penton(*) in charge of work:_jj. REMARKS; As PM IRC 2009 lug Vl Coggirgga2.ramsteanDis FEE: $0.00 kaFeniri:VilonnlatlIkIns• Pel4to cern/4,Am./ et-7 CORY to- 743 - EFTA01114010 Permit #018-12 I LSJ Project #1014 LSJ Project Name - Dock Shelters I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CM1T Project Manager KMI Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR No. 018-12 . Date 10/1112011 BUILDING PERMIT GOVERNMENT OF "EDF. VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DIVISION Or PITRhiliTS Cyril IL Klny AI int el. Thomas 00402 Tel, Pau: PERMISSION IS HEREBY GRANTED TO• LSJ. 1-LO TO (ccoastfacl. ru..HIt. 414): remillare New Shag, Deseriplion of structure .4y per ApprOved Male, Location: Panne/ No. C thnir SI. Amu , Approximate cost of work* 148,921.00 Persoo(a) In charge or wont: Too REMARK S: Asper /RC 2009 and VI Code fl u.. .29 if 9..3 ode p0esneo per eilmenc00.18/ to ACI 7073. permit for the InvI04000•0 vo, Natter Merin:et a rvig44 lx 4•4 regitire4/. FEE: S. "5." EFTA01114011 Permit #011-12 I LSJ Project #1015 1 LSJ Project Name - Five Palms 1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pm-Inspection Check List Attached) 2) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CM1T Project Manager KM1 Inspection Group Office: Cell: Fax: 3) Correction of noncompliance issues, if any — LSJ personnel 4) Re-inspection of corrected issues — Kraus Manning 5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 6) Final inspection — DPNR 011-12 Date 10/13/2011 BUILDING PERMIT GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF PLANNING AND NATURAL RESOURCES DIVISION OF PERMITS 45 Mars Hill FrederIcksted St. Croix 00840 Cyril E. Kin Airport, St. Thomas 00802 Tel: Fax: Tel: Fax: PERMISSION IS HEREBY GRANTED TO: in LIC TO (Construct, repair, etc): Addition-Music Room Description of structure. As Per Plans Submitted Location. Little St James 71,00.00 Approximate cost of work: Person(s) in charge of work: Tal) REMARKS: As per IRC 2009 and VI Code Title 29, Ch. 5 Code Compliance: *RAs per Amendment to Act 7075, permitfor the installation ofsolar thermal system is not required. 246.75 2 FEE: $ ConantationaPlanning and Natural Resources EFTA01114012 Permit # 133-08 LS1 Project #1002 LS1 Project Name - Mechanical Building (Shell) 1) LSJ Personnel Preliminary waikthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Schedule Maguire Group Inc.— Inspection 33 Commerical Street, Suite One Foxborou MA 02035 Tel. Fax 3) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CMIT Project Manager KMI Inspection Group Office: Cell: Fax: 4) Correction of noncompliance issues, if any — LSJ personnel 5) Re-inspection of corrected issues — Kraus Manning 6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ 7) Final inspection — DPNR BUILDING PERMIT — 20. 2007 Date Dec. GOVERNMENT OF THE VIRGIN ISLANDS — o— DEPARTMENT OF PLANNING AND NATURAL RESOURCES INVISION OP PERMITS CURL E 10/0 TERMINAL BUILDING. 20zi FLOOR FAX cmAFILOTTO MIME. SI 1040mAs. VI 00002 TEL PERMISSION IS HEREBY GRANTED TO LSI, LI.0 TO (Computt IN.v.Ma Construct Mechanical Building DosCliplIOn of SWOCIUM: Rein!. Conc. • Locariew iLittle St. James Approximate cost of work: $ *2.000,000 Person(s) In charge of work: Lafayette Contractors, LLC REMARKS: Construction shall be done In accurdance with Ti lion 292 of the V.1. Building Code FEE: E 20.00 ._ Territorial Director Com miexNnw et Mein° and wear Reeewern C'F/r) fieZr- 53-04 //-7-e9 EFTA01114013 Permit #375-08 LSJ Project # 1010 LSJ Project Name - Mechanical Desal (Outfit) 1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List Attached) 2) Schedule Maguire Group Inc.— Inspection 33 Commerical Street, Suite One Foxborough, MA 02035 Tel. Fax 3) Scheduled Krauss Manning to do final inspection to insure compliance: Tony Coffelt, CM1T Project Manager KM1 Inspection Group Office: Cell: Fax: 4) Correction of noncompliance issues, if any — LSJ personnel 5) Re-inspection of corrected issues — Kraus Manning 6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/I,SJ 7) Final inspection — DPNR per:At to. 375-06 BUILDING PERMIT Rale GOVEItNiVIENT OF Tilt: VIRGIN ISLANDS —0 DEPARTMENT OF MANNINO AND NATURAL RESOURCES OrreliONOIOCIOSTO WO. k TrADOIAl 00•01%0 m IN* : A) ■ CiOALOtle matt it 214CIIVO V. /OW PERMISSION IS HERESY ORANICO TO ki kr TO iZtetwi.000, v. I InntuIlitIon el PROINUrnI EinIffent, Desalpien of situcluic tocafion ApproXIMAW C0,10i wort I POISOO(S) in clues* el nett LaIsyncte Coscrutors nett.", shall be J-'nasIa ACCO - La( iiint ,7a•:2 rrrrr t011ii Ulnae. ME: s oirliwalo0;dt-40•21.4ii;;;;;•—• C741 i ccenur ' 0' Czr- 63.-OIL //- 7 -07 EFTA01114014 Certificate of Occupancy Pre-Inspection Check List Health & Safety _Interior Surfaces _Egrees (exits) Plumbing _Pest Control Fixtures _Water System Grounds _Water Heater _Garbage & Debris _Sanitary Drainage _Grading & Drainage _Walkways & Driveways Mechanical _A/C system Exterior Electrical _Foundation Walls _Ground Fault Circuit Interrupter(s) _Exterior Walls _Roof & Rood Drainage Fire Safety Windows & Doors _Fire Extinguisher _Smoke Detector Interior _Stairs, Handrails, Guardrails Egress -a safe, continuous and unobstructed means of egress shall be provided from the interior Structure Pest Control - Structures shall be generally free from wood destroying insects and rodent infestation Sanitation —Grounds and structures shall be maintained in a clean, safe, and sanitary condition Grading & Drainage - All premises shall be sufficiently graded and sloped in a approved manner to prevent the erosion of soil and water accumulation around immediate perimeter of any structure Walkways & Driveways — Free from potentially hazardous conditions or major defects. Foundation Walls & Exterior walls— shall be free major defects, deterioration, or open cracks. Roof - be sound, tight and not have defects that admit rain. Rood Drainage components should be adequate to drain collected roof run-off. Window and Doors - Frames and hardware should be in sound condition Stairs, Handrails & Guardrails - should be in good repair and firmly fastened to support normal loads Fixtures— free from obstructions, leak, major defects, and performing intended purpose. Water Systems — Kitchen sinks, lavatories, laundry Facilities, bathtubs and showers should be supplied with hot and cold running water with adequate volume and water supply to ensure fixtures to function properly EFTA01114015 Water Heater — Temperature not less than 110 degrees. Sanitary Drainage — Plumbing fixtures should be properly connected to an approved disposal system, free from obstructions, leaks and major defects Air condition system — Ensure system is functioning properly Electrical - Ensure system is functioning properly. Look for potential hazards, insufficient outlets Ground Fault Interrupter— Ensure GFI are installed at potentially wet areas or where water can splash Fire Safety - Egress, fire extinguisher , single station smoke detector, shall comply with the Uniform Fire Code EFTA01114016
ℹ️ Document Details
SHA-256
dccd640b2dc1f1428ddae1cb340a80ee7283bc7b52213af6dcffac4bfd2e41e6
Bates Number
EFTA01114006
Dataset
DataSet-9
Document Type
document
Pages
11

Comments 0

Loading comments…
Link copied!