📄 Extracted Text (2,110 words)
Permit #230-09 LSJ Project #1004 LSJ Project Name -Master Bedroom
I) LSJ Personnel re imtnary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. 230-09 BUILDING PERMIT DM0 ,:uno I
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OP PlinhisTS
mina F KING TIOMINM BUIIDING AM I WON
FAX CHAIII Or IF. AMNLIL, SI mow , . v
PERMISSION IS HEREBY GRANTED TO Jetirey gpnleln
TO (Consfluct INNA.AIC I Renovnt Jon 6 Add It Ion
Description of structure: 8" Bike w/ Stone Minich
Location: Mitt le St. /ruses;
Approximate cost of woo*: S 191,1)3.90
Person(s) In chaise of work: Undecided
REMARKS: Contraction shell be done In accorsionee pith TIM. 29, action 292 oL the V.L.
Building Code
FEE: $ 423-00 teen kit 41- Olt era. Torritorla; Director
CommIssionoi el Planning and NaNtal Resoucces
EFTA01114006
LSJ Permit #265-10 LSl Project # 1006 LSJ Project Name - Laundry
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. De-811:0281.1.0.-- Date.0(230114_____.
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45M a Treacrucksted. SI CMIX 00840 Cynl T. SI I ma 00802
TN Fox Tel Fax
PERMISSION IS HEREBY GRANTED TO: • LSJ. LLC
TO (Construct, Repair, etc.):Stclicn Renpvatioriandla8ndry Acklbon _
Description of structure:_AAPer APPreYed_PJACit_
Location: LIMO St. JaM0STRFIISS
Approximate cost of work: $187480.08
Person(*) In charge of work: TBD
REMARKS:.AS_Efm-LK1009 LVISzlelills29 Comalmace
FEE:$0,00
usnits. war S09 4.0.44Pin.g a la la, COO
EFTA01114007
Permit #265-10 1.51 Project # 1007 LSJ Project Name -Kitchen
I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. a Date .
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DWISION Of PERMITS
FS Cy SI
Felt kract Tot Fax ISM
PERMISSION IS HEREBY GRANTED TO: • I Ski.
TO (Construct, Repair, etc.):_StagagaRegfatalmrtand_LagndetAgglign
Description of structure:_As POI Aooroyee_Oana
Location:, _LAM St. Jenhal*nd
Approximate cost of work:, StEty.010,00
Person(s) in charge of work: TOO
REMARKS:. Aereffie_209nil Colle_TOtaCDMPlinaCe
EFTA01114008
Permit # 117-11 LSJ #Project -1011 Main House (Cabana)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
Date 08/26/2011
• AMU_
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 MwthatsfAils4 . emetriiii040 at:
Tel: Fax: Tel:
CYl t Fax:
PERMISSION IS HEREBY GRANTED TO: LA fit:
TO (Construct, repair, *Icy Addition-Cabonna
Description of structure: As Per APPrered Plans
Location: Ma "C" Little St James
123,06400
Approximate cost of work.
Person(s) In charge of work: TBD
Code Compliance: * * Asper amendment
REMARKS: As per *MC 2009 and VI Code 71de 29, Ch. 5
in Ad 7075, petrol!for the installwion ofsolar thermal vstest is not repaired
34&40
FEE: S
tormilerrorind MM.. Resou s
EFTA01114009
Permit #CN 1049 I LSJ Project 1013 I LSJ Project Name - Flagpole Pool
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Ins ction Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. _Ott 1049_ Date Fab. 7. 2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
OMSION Of PERMITS
AMed
FIK Ttrl.
PERMISSION IS HEREBY GRANTED TO' L SA II C
TO (Construct, Repair, etc.): C0IMMtrool wi Cabana, Desk A Lauprotallo
% om
Description of structure:J prots
Location: PendaSL_Jarno 'Vann
Approximate coat of work: $383 300.00
Penton(*) in charge of work:_jj.
REMARKS; As PM IRC 2009 lug Vl Coggirgga2.ramsteanDis
FEE: $0.00
kaFeniri:VilonnlatlIkIns• Pel4to
cern/4,Am./ et-7
CORY to- 743 -
EFTA01114010
Permit #018-12 I LSJ Project #1014 LSJ Project Name - Dock Shelters
I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. 018-12 . Date 10/1112011
BUILDING PERMIT
GOVERNMENT
OF "EDF. VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION Or PITRhiliTS
Cyril IL Klny AI int el. Thomas 00402
Tel, Pau:
PERMISSION IS HEREBY GRANTED TO• LSJ. 1-LO
TO (ccoastfacl. ru..HIt. 414): remillare New Shag,
Deseriplion of structure .4y per ApprOved Male,
Location: Panne/ No. C thnir SI. Amu ,
Approximate cost of work* 148,921.00
Persoo(a) In charge or wont: Too
REMARK S: Asper /RC 2009 and VI Code fl u.. .29 if 9..3 ode p0esneo per eilmenc00.18/ to ACI
7073. permit for the InvI04000•0 vo, Natter Merin:et a rvig44 lx 4•4 regitire4/.
FEE: S. "5."
EFTA01114011
Permit #011-12 I LSJ Project #1015 1 LSJ Project Name - Five Palms
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pm-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KM1 Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
011-12 Date 10/13/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill FrederIcksted St. Croix 00840 Cyril E. Kin Airport, St. Thomas 00802
Tel: Fax: Tel: Fax:
PERMISSION IS HEREBY GRANTED TO: in LIC
TO (Construct, repair, etc): Addition-Music Room
Description of structure. As Per Plans Submitted
Location. Little St James
71,00.00
Approximate cost of work:
Person(s) in charge of work: Tal)
REMARKS: As per IRC 2009 and VI Code Title 29, Ch. 5 Code Compliance: *RAs per Amendment to
Act 7075, permitfor the installation ofsolar thermal system is not required.
246.75
2
FEE: $
ConantationaPlanning and Natural Resources
EFTA01114012
Permit # 133-08 LS1 Project #1002 LS1 Project Name - Mechanical Building (Shell)
1) LSJ Personnel Preliminary waikthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
Foxborou MA 02035
Tel.
Fax
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
7) Final inspection — DPNR
BUILDING PERMIT — 20. 2007
Date Dec.
GOVERNMENT OF THE VIRGIN ISLANDS
— o—
DEPARTMENT OF PLANNING AND NATURAL
RESOURCES
INVISION OP PERMITS
CURL E 10/0 TERMINAL BUILDING. 20zi FLOOR
FAX cmAFILOTTO MIME. SI 1040mAs. VI 00002 TEL
PERMISSION IS HEREBY GRANTED TO LSI, LI.0
TO (Computt IN.v.Ma Construct Mechanical Building
DosCliplIOn of SWOCIUM: Rein!. Conc.
•
Locariew iLittle St. James
Approximate cost of work: $ *2.000,000
Person(s) In charge of work: Lafayette Contractors, LLC
REMARKS: Construction shall be done In accurdance
with Ti lion 292 of the V.1.
Building Code
FEE: E 20.00
._ Territorial Director
Com miexNnw et Mein° and wear Reeewern
C'F/r) fieZr- 53-04
//-7-e9
EFTA01114013
Permit #375-08 LSJ Project # 1010 LSJ Project Name - Mechanical Desal (Outfit)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
Foxborough, MA 02035
Tel.
Fax
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KM1 Inspection Group
Office:
Cell:
Fax:
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/I,SJ
7) Final inspection — DPNR
per:At
to. 375-06 BUILDING PERMIT Rale
GOVEItNiVIENT OF Tilt: VIRGIN ISLANDS
—0
DEPARTMENT OF MANNINO AND NATURAL RESOURCES
OrreliONOIOCIOSTO
WO. k TrADOIAl 00•01%0 m IN*
: A) ■ CiOALOtle matt it 214CIIVO V. /OW
PERMISSION IS HERESY ORANICO TO ki kr
TO iZtetwi.000, v. I InntuIlitIon el PROINUrnI EinIffent,
Desalpien of situcluic
tocafion
ApproXIMAW C0,10i wort I
POISOO(S) in clues* el nett LaIsyncte Coscrutors
nett.", shall be J-'nasIa ACCO -
La( iiint
,7a•:2 rrrrr t011ii Ulnae.
ME: s
oirliwalo0;dt-40•21.4ii;;;;;•—•
C741 i ccenur ' 0' Czr- 63.-OIL
//- 7 -07
EFTA01114014
Certificate of Occupancy
Pre-Inspection Check List
Health & Safety _Interior Surfaces
_Egrees (exits) Plumbing
_Pest Control Fixtures
_Water System
Grounds _Water Heater
_Garbage & Debris _Sanitary Drainage
_Grading & Drainage
_Walkways & Driveways Mechanical
_A/C system
Exterior Electrical
_Foundation Walls _Ground Fault Circuit Interrupter(s)
_Exterior Walls
_Roof & Rood Drainage Fire Safety
Windows & Doors _Fire Extinguisher
_Smoke Detector
Interior
_Stairs, Handrails, Guardrails
Egress -a safe, continuous and unobstructed means of egress shall be provided from the interior
Structure
Pest Control - Structures shall be generally free from wood destroying insects and rodent infestation
Sanitation —Grounds and structures shall be maintained in a clean, safe, and sanitary condition
Grading & Drainage - All premises shall be sufficiently graded and sloped in a approved manner to
prevent the erosion of soil and water accumulation around immediate perimeter of any structure
Walkways & Driveways — Free from potentially hazardous conditions or major defects.
Foundation Walls & Exterior walls— shall be free major defects, deterioration, or open cracks.
Roof - be sound, tight and not have defects that admit rain. Rood Drainage components should be
adequate to drain collected roof run-off.
Window and Doors - Frames and hardware should be in sound condition
Stairs, Handrails & Guardrails - should be in good repair and firmly fastened to support normal loads
Fixtures— free from obstructions, leak, major defects, and performing intended purpose.
Water Systems — Kitchen sinks, lavatories, laundry Facilities, bathtubs and showers should be supplied
with hot and cold running water with adequate volume and water supply to ensure fixtures to function
properly
EFTA01114015
Water Heater — Temperature not less than 110 degrees.
Sanitary Drainage — Plumbing fixtures should be properly connected to an approved disposal system,
free from obstructions, leaks and major defects
Air condition system — Ensure system is functioning properly
Electrical - Ensure system is functioning properly. Look for potential hazards, insufficient outlets
Ground Fault Interrupter— Ensure GFI are installed at potentially wet areas or where water can splash
Fire Safety - Egress, fire extinguisher , single station smoke detector, shall comply with the Uniform Fire
Code
EFTA01114016
ℹ️ Document Details
SHA-256
dccd640b2dc1f1428ddae1cb340a80ee7283bc7b52213af6dcffac4bfd2e41e6
Bates Number
EFTA01114006
Dataset
DataSet-9
Document Type
document
Pages
11
Comments 0