EFTA01779069.pdf
👁 1
💬 0
📄 Extracted Text (197 words)
From: Gary Kemey <.1.1111W
Sent: Wednesday, Apn ,
To: Jeffrey Epstein
Subject: terrace costs
=BODY> =DIV> rough estimate =or walls and deck per gensler concept drawings sent 4-11-11 =DIV> =DIV>I did not
include the living room and =ts N. & E. improvements nor the pool deck which is not your =oncept =DIV> =DIV>all based
on in house labor =DIV> =DIV>
=DIV> area east =nd south of pool
=DIV>
=DIV>1600sq.ft. =eck &nb=p; =39,000
=DIV>255If. 8" stone =alls &n=sp; 90,000
=DIV>50If. 4"stone =alls &n=sp; &nb=p;2,50O
=DIV>stairs =nbsp; &=bsp; &n=sp; 15,000
=DIV>hand =ails &n=sp; &nb=p; 15,0=0
=DIV>elect/lighting &nbs=; = =5,000
=DIV> =nbsp; sub =otal &n=sp; $186,500
=DIV>contingency 20%&nbs=; = 37,500
=DIV> =nbsp; &=bsp; =nbsp;total &n=sp; $224,000
=DIV>
=DIV>
=DIV>
=DIV> area from =he west wall of the new living room to the master =uite
=DIV>
=DIV>
=DIV>5,900 sq.ft. =eck &nb=p; &nbs=; $94,000
=DIV>350 LF. 10' high retaining =all &nb=p; 120,000
=DIV>350 LF. 10' stone =eneer &=bsp; =75,000
=DIV>cols.,and hand rail =tone &n=sp; &nb=p; 52,000
=DIV>stairs =nbsp; &=bsp; &n=sp; &nb=p; 30,000
=DIV>handrails &nb=p; &nbs=; =nbsp; 30,000
=DIV>electAighting &nbs=; =nbsp; =0,000
=DIV> =nbsp; &=bsp; sub =otal &n=sp; $551,000
=DIV>contingency 8t=bsp; 20% = =nbsp; 110,000
=DIV> =nbsp; 8c=bsp; =otal &n=sp; $661,000=/DIV>
EFTA_R1_00096042
EFTA01779069
ℹ️ Document Details
SHA-256
dd82561b7d0b76cbecc531f6fb8035de321607d1812f481452ec75ca5b23733c
Bates Number
EFTA01779069
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0