👁 1
💬 0
📄 Extracted Text (645 words)
To: Gary Kerne
From: Jeffrey Epst
Sent: Sat 11/13/2010 9:53:42 PM
Subject: Re: FW: LSJ - Pool and Main Residence
ok
On Sat, Nov 13, 2O1O at 7:33 PM, Gary Kerney wrote:
Jeffrey
The time to get proposals from MEP and structral is after schematic design. At that point we can influence
the slinplicty of what we want ,especially structral where they overdesigned before.We also talked to
warwick that we want to go with spit systems in several areas which have minimal involvment of
mech.gesign.
I would also wait for the schematic for const.adm.
I think asking for fees at this time will result in higher fees to cover unknowns which will be resolved after
schematic and pre construction doe. conferences.
Gary
From: Jeffrey Epstein [malito:jeeyacationegmail.com]
Sent: Sat 11/13/2010 9:39 AM
To: Gary Kerney
Subject: Re: FW: LSJ - Pool and Main Residence
ask them to provide contracts for mechanical construction. and administration.
On Sat, Nov 13, 2010 at 12:52 PM, Gary Kerney wrote:
Jeffrey
This fee is in line with schematic design per my estimate .1 reccomend you approve.
Gary
From: Warwick Wicksman [mailto
Sent: Fri 11/12/2010 6:32 PM
To: Gary Kerney
Cc: Tom Sze; Doug Schoettle; Zattia Mitchell; Rich Kahn; Darren Indyke (AOL)
Subject: RE: 15.1 - Pool and Main Residence
Hi Gary.
Attached is our proposal for the pool area and main residence. This is to develop the current scheme. for just this
area, to a Schematic Design level. Once that is done, assuming there are no major changes, we will provide a
separate proposal to prepare constmction documents and engineering as necessary. This will simply the CD
EFTA_R1_00468112
EFTA01980166
phase, and simply the work of any required consultants.
I am working on proposals for conceptual design services the Spa and Guest Cottage, and will send them on
Monday.
Thanks,
Warwick
Warwick Wicksman, AIA
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
From: Gary Kerney [mailto:
Sent: Wednesday, November .....
To: Warwick Wicksman
Subject: Fwd: LSJ
FYI F I let's get the doe's going, include the spa
Sent from my iPhone
Begin forwarded message:
From: "Jeevacation" <[email protected]>
Date: November 10 2010 7-11.18 AMA T
To: "Gary Kerney"
Subject: Re: LSJ
Yes fl
Sony for all the typos .Sent from my iPhone
On Nov 10, 2010, at 1:07 PM, "Gary Kerney" wrote:
Jeffrey
EFT&R1_00488113
EFTA01980167
were the 11/3 Fl or F2 schemes close enough to your concept to have Gensler
take one of them to the next level and contract? also should they be producing a
schematic for the SPA to review
From: Warwick Wicksman [maillo
Sent: Tue 11/9/2010 7:27 PM
To: Gary Kerney; Doug Schoettle
Cc: Toni Sze
Subject: LSJ
Guys, any word from Jeffrey on how he wants to proceed?
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
********************************** *************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected] and
destroy this communication and all copies thereof,
including all attachments.
EFTA_R1_00468114
EFTA01980168
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to ice\ [email protected] and
destroy this communication and all copies thereof,
including all attachments.
EFTA_R1_00488115
EFTA01980169
ℹ️ Document Details
SHA-256
de52dde6ee71728a716955c83f33d7ec6e3928bbd1a10de9d291c8e45944c402
Bates Number
EFTA01980166
Dataset
DataSet-10
Type
document
Pages
4
💬 Comments 0