EFTA02376241
EFTA02376242 DataSet-11
EFTA02376244

EFTA02376242.pdf

DataSet-11 2 pages 467 words document
P17 V16 V11 P23 V12
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (467 words)
From: Ann Rodriquez Sent: Thursday, April 27, 2017 10:56 AM To: Rich Kahn Cc: Jeffrey Subject: Staff Cottage: revised work schedule on cottage from Dave Attachments: revised lsj cottage scheduled-a; Untitled attachment 00091.htm David Starofsky 6501 Red Hook PlazaSuite 201 St Thomas VI <=p> Revised Schedule for LS) Cottage=Rmodeling <=p> Apri 29th Start painting i=side kitchen, Laundry and office areas Cannot finish painting rest of a=ea due to electrical panel needs installed and air conditioners need replac=ng. May 1-5th install kitchen cabine=s, exhaust hood for stove, appliances and interior doors. Also Hughes elect=ic will install all plugs and lights for new addition. He was contrac=ed for 4,000.00 with permision from Brice because Danny Vicers did not have=time to complete it. He was not contacted to install new electric panel if Pis needs to be done it will be an additional cost. All electric origi=ally was to be done by in house empoyees. This is based on hardware for do=rs to be bought May 8-12th Finish drywall r=st of area bedroom and living area if AC and Electric panel is installed, w=rk on finishing outside tile and outside deck if plumbing is finished=for downspouts from roof. This is in house work. May 15.19th Finish lose ends unt=l windows, doors and skylights come in. I placed an order for these M=rch 16th and were to be here already. When I called about delivery he=had not ordered them at all so when he ordered them delivery is Nay 19th May 22-May 31install windows, d=ors and skylights. Then complete tile work inside and out need doors i=stalled to finish tile. Roof and install gutters. Outside new area ready for exter=or painting also have advised that it can be completed two weeks ago=/p> EFTA_R1_01385612 EFTA02376242 Up to this date I have had 76 ho=rs of downtime due to noise which resulted in 280 man hours This is almost t=o weeks of time loss. I am sure that with Anna"s help t= get electric panel resolved , plumbing work done, ac completed and paintin= to be done by in house we can complete this by above date. I have drawn 20,800.00 so far an= balance of 9,200.00 is left. I will hold back 6,200.00 till job comp=eted and draw 3,000.00 to pay employees til job finished. <=iv> Ann R. Begin forwarded message: From: david starofsky Date: April 27, 2=17 at 6:05:57 AM AST To: Ann Rodriquez Subject: rev=sed work schedule on cottage Reply-To: david starofsky 4=lockquote> Anna I have attached a revised schedule for your review. I know th=t with your help on electric panel, plumbing and completing new AC units we=stick to this schedule Also I noted the amount of dow= time due to noise and Mr Epsteins requests. T=ank you for your time and consideration on this Dave<=div> 2 EFTA_R1_01385613 EFTA02376243
ℹ️ Document Details
SHA-256
deaa543aa6a29b7d46f2089428d87a6aa4f90210e2958258c398680182ed5488
Bates Number
EFTA02376242
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!