From: Leighton Allenby < >.
Sent: Friday, July 31, 2015 4:23 PM
To: Jeffrey Epstein; Richard Kahn
Cc: Bill Hague; Anna Rodriquez
Subject: Re: LSJ Plate Work
Hello Anna and Bosco=,
Can you please go over every inch of Big D and determine when =he bleeding to Mr. Epstein is going to stop.
I know I am coming =n late in the last quarter but there should have been a survey recommended=so this
additional work outside of the original budget did=e39;t occur and a 10 to 15% mic added for unforeseen. I see
no other optio= but to
recommend to Mr. Epstein and Richard that this
Mr. Epstein and Richard,
I this additional $47,390 expenditure=approved?
cant color="eff0000">Best,
Leigh=on
Good Morning Anna-
Upon reviewing and inspecting the=inside of the compartments, forward of the engine room, we have
come up wi=h a quotation
for repairing all the "wasted" plate. Ap=roximately 160 square feet of plate has to be cut out and
replaced. The sq=are footage equals
848LBS x $45 per pound the total would be $38=160 (This price includes all labor and material). We will
also have to rem=ve both keel
coolers due to their location with the plate that h=s to be cut out. We will also have to fabricate two
new boxes in which the= sit and
then remount these boxes once the new plate is we=ded into place. The price for this is $5850 includes
labor and material. T=o water
tight bulkheads are also compromised and several a=eas will need to be "cropped" out and replaced.
Labor and materi=ls is $3380.
We will also "plug weld" 12 more ad=itional areas that have deteriorated and need to be addressed.
These two c=mpartments have
been inspected by both Gabriel, the projec= manager, and Bosco. In addition, the emergency bilge
pump system nee=s to be renewed
and it is our recommendation to have =osco undertake this job. Please note that we have not charged
any addition=l lay days and
will continue not to. The areas that need t= be cut out and replaced are very confined and difficult to
work in.=C2*With the savings on lay
days it is over $3500 so=we will not be able to move on our final quotation. I have also attached a=few
pictures
Total f=r labor and material $47,390
<=div>
EFTA_R1_01333192
EFTA02353028
Leighton Allenby</=ont>
Director of =roperties
On Fri, Jul 31, 2015 at 11:43 AM, Ann Rodriq=ez <
<mailto: > wrote:
Ann R.<=cliv>
Begin forwarded message:
From: gene kral = target=>
Date: July 31,=2015 at 11:19:19 AM AST
To: Ann Rodriquez st >>
Subject: Fw: LSJ Plate Work
Reply-To: gene kral &l=;
Good Morning Ann=-
Upon reviewing and inspecting the inside of the compartments, =orward of the engine room, we
have come up with a quotation for repairing =11 the "wasted" plate. Approximately 160 square feet of plate ha= to be cut
out and replaced. The square footage equals 848LBS x $45 per po=nd the total would be $38,160 (This price includes all
labor and material)= We will also have to remove both keel coolers due to their location with =he plate that has to be
cut out. We will also have to fabricate two new bo=es in which they sit and then remount these boxes once the new
plate is we=ded into place. The price for this is $5850 includes labor and material. T=o water tight bulkheads are also
compromised and several areas will need t= be "cropped" out and replaced. Labor and materials is $3380. We=will also
"plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have
been inspected =y both Gabriel, the project manager, and Bosco. In addition, the emer=ency bilge pump system needs
to be renewed and it is our recommendation40=A0to have Bosco undertake this job. Please note that we have not
charged a=y additional lay days and will continue not to. The areas that need to be =ut out and replaced are very
confined and difficult to work in. =ith the savings on lay days it is over $350O so we will not be able t= move on our final
quotation. I have also attached a few pictures
Total for labor and material.= $47,390
<=mg width="423" height="238" alt="Inline image 7" src="cid:ii_14ee4r8f47c3b9d2">
=/blockquote>
2
EFTA_R1_01333193
EFTA02353029
<1=iv>
3
EFTA_R1_01333194
EFTA02353030
ℹ️ Document Details
SHA-256
df78a8ed32664b4497c43fd9a44b20a4f852b04d476380b90412c09855c7f85e
Bates Number
EFTA02353028
Dataset
DataSet-11
Document Type
document
Pages
3
Comments 0