EFTA01878797.pdf

DataSet-10 1 page 197 words document
👁 1 💬 0
📄 Extracted Text (197 words)
To: Jeffre E. tel I m Cc: From: Sent Fri 6/1/2012 5:06:48 PM I would like your approval to use Penn to do 8H bathroom. I have gotten quotes from 3 other contractors to do the work, and they have all come back with a quote of $21,000-22,000 with the work taking 2-3 weeks. Penn has given me a quote of $12,500 to do the work with a 2 week estimate. He can start the demo on Monday. All of the materials will be delivered to the apt on Tuesday. He said as long as he has all materials on hand, then he can be quick about doing the work. Also, since our tiles are quite large, that will save alot on time. He said the reason took so long was we didn't have all the materials at once, and the subway tiles take much longer to install than larger tiles. All of the bathrooms he has done for us in the past has had a very good result, the building knows him, his workers are already here, and his quote is almost half of other contractors. Is it OK to proceed with using him? EFTA_R1_00290009 EFTA01878797
ℹ️ Document Details
SHA-256
e02dd7eb29695b4da185ff8e497039d050ddf99f1acbdbf738af86137878598c
Bates Number
EFTA01878797
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!