Change Order #6
Proposal submitted to: Work to be performed at:
Name: LSJ, LLC Little St. James
Street: 6100 Red Hook Quarter Ste. B3 Main Compound Pool #10Il
City: St. Thomas State: U.S.V.I.
Zip: 00802 Email:
Phone:
We here y propose to urms t e following materials and perform the labor necessary for the completion of the following:
- Chip out all existing plaster and prep for new plaster
NOTE: THIS CHANGE ORDER FOR LABOR ONLY AT COST
All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted 11w above
work and completed in a substantial workmanlike manner for the sum of:
S 15450.00 - Fifteen thousand five hundred fifty dollars
With payments to be made as follows:
Due upon completion of chip out
Any alteration or deviation from above specifications involving extra costs will be executed only upon written order: and will become an extra charge over and above the estimate.
All agreements contingent upon strikes, accidents, or delays beyond our control. Homeowner to ...any fire. tornado. and all other necessary insurance upon above work.
RmpectIldly Submitted:
Per. Dan Wolterman
Note: This proposal may be withdrawn by us if not accepted within 30 days.
ACCEPTANCE OF PROPOSAL
The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. Payment will be made as outlined above.
Date Signature
EFTA_R1_00260416
EFTA01860555
ℹ️ Document Details
SHA-256
e03d514f02f31bc75a10b88e171d005fb4fe73841c17aecb1696fe9c0b703fc9
Bates Number
EFTA01860555
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0