📄 Extracted Text (2,394 words)
Memorandum
To: JEE
From: DKI
Date: September 23, 2016
Re: Oppenheim Architecture Proposal
I have reviewed the Oppenheim Architecture proposal and based on the
document alone, without knowing anything about the firm, would not proceed on
the terms proposed.
Generally, Oppenheim Architecture is proposing that you pay $100,000 in
advance for an "initial concept design" of GSJ that is to be developed over a six week
period. The program information appears to be somewhat detailed, but there is no
statement as to total projected program area, structure sizes, etc. As discussed
below, there should also be greater specificity in the deliverables so that you can
ensure that you are receiving value for your design money. Payment ought to be
tied to stages and your satisfaction with specific deliverables within each stage of
the Initial Concept Design phase. For what it is worth, this seems like a substantial
amount of money for a concept design, and because of the lack of specificity and the
requirement of full payment of the design fee in advance, you will not be able to
ensure that the fees will be limited to the initial $100,000, especially in light of the
usual give and take and multiple revisions ordinarily required during the course of
design development.
Rough notes of my specific concerns with the proposal as written are set
forth below:
1. Section 1.1 Commencement:
• Oppenheim is requiring you to provide them with a 3D topographical survey
of the Island in CAD format. Do you have such a survey available? If not, are
you going to have to commission one in order for Oppenheim to start the
work?
• Oppenheim also requires a survey with existing buildings. Same question.
• Oppenheim requires you to provide engineering studies, but does not specify
what engineering studies it requires. Again, what particular engineering
studies will you need to provide, how much will it cost? Why is that not
specified in this proposal? And why is that not something that Oppenheim
should do if it is a necessary part of the initial concept design?
• Note that you will also have to provide location of the dirt trails and any
aerial photographs you have. If Oppenheim is preparing the design, why
doesn't the firm come out to the Island and use a drone and take whatever
photographs it needs. This should be Oppenheim's responsibility since
Oppenheim wants to use it for its design work.
EFTA_R1_00007463
EFTA01733577
• Oppenheim requires you to provide existing studies previously
commissioned. Others' work should not influence Oppenheim's work Nor
should Oppenheim be relying on anyone else's work in producing its own.
Oppenheim should do an independent job particularly when it is charging
$100,000 for the work
• Probably most important, Oppenheim is holding you responsible for
providing "all local code, zoning and environmental related criteria."
Oppenheim also provides that Oppenheim is not responsible for any
inaccuracy of information provided by you. Oppenheim is the professional
Architecture firm; you are not. Oppenheim should be able to research local
requirements and provide a design that conforms to those requirements.
Oppenheim is not simply being asked to provide pretty pictures for
$100,000.
• In fact, as discussed below, Oppenheim's proposal requires that the pretty
pictures of the Initial Concept Design - i.e., "professional renderings" must be
commissioned from a third party at an estimated cost of $4,000 each, payable
in advance.
2. Section 1.2 "Design Process, Meetings and Approval":
The title of this Section of the proposal is a bit misleading as there is no
discussion of either meetings with you or the approval process. The design process
is discussed in general ways and even the deliverables, though more concrete, are
still too vague to enable anyone to understand fully all of the documents you will
have a right to expect from Oppenheim in competing the Initial Concept Design.
Specific concerns are as follows:
• There is no reference to any site visits to the Island. Assuming that
Oppenheim made an initial site visit, is that sufficient? Shouldn't Oppenheim
spend some time there after beginning the conceptualization in order to
refine it?
• There is no reference to specific meetings with you. There is a mention of a
final presentation to you which will be assembled during weeks 5 and 6 after
the design has been finalized. Should there not be a few meetings with you to
present initial items so you have an opportunity to comment and refine the
presented items and so that Oppenheim better understands your vision and
program? How else will you or Oppenheim be able to gain any sense if you
are both on the same page?
• What is stated is that in weeks 1-4 Oppenheim will develop the designs that
comply with Client wishes and other special local zoning,
conditions/considerations." Without site visits, meetings as discussed above,
how does this occur?
• There is no specific mention of particular designers or the level of experience
of the team that will be assigned to your project (i.e., principal of the firm,
Senior Project Manager Project Manager/Team leader, Senior designer,
EFTA_R1_00007464
EFTA01733578
designer, etc.). Nor is there any mention of how many people will be
assigned to your project? With multiple deliverables, the fewer people
assigned to the project, the more likely completion of the project will take
longer than 6 weeks. And if so, then it will cost more than the initial
$100,000 to complete the Initial Concept Design.
• Does Oppenheim have specific personnel with Caribbean or tropical locale
experience? Did you seek Oppenheim out because of the work of a particular
designer? If so, the proposal should specify that those people will be
primarily responsible for completion of the design work and deliverables.
• There is a statement in this section that the initial program "will be used as a
general guide with the understanding that jt may change slightly during the
process of this exercise." Is Oppenheim suggesting that it has the right to
change the initial program or is it merely acknowledging that you may
change the program? What does slightly mean? Given that there is a
provision in Section 1.4 of the proposal that "If program areas and
complexity increases significantly, fees will be adjusted accordingly", vague
concepts such as "slight" changes and "significant" increase create room for
Oppenheim to demand further fees before you get what you want. This is
especially true because, as indicated below, the full Initial Concept Design fee
is payable in advance before Oppenheim even commences work If
Oppenheim claims that your program changes are more than slight or
significantly increase the program area or complexity, Oppenheim can simply
not complete the work until you pay Oppenheim more money.
3. Section 1.3 Deliverables. The deliverables list in Section 1.3 provides some
level of detail of what Oppenheim is required to deliver to you, but is still too vague
for there to be a meeting of the minds on precisely what you are going to get and
whether if you ask for more than you are given by Oppenheim, Oppenheim will seek
to charge you more:
• "Overall Site Plan for the Island depicting general location of new program
and structures "- Size, scale, level of detail, what about existing structures in
relation to new structures? Changes and Revisions if Oppenheim does not get
it right? Oppenheim provides that the Site plan will take into consideration
things like sightlines/views, wind currents, natural light, privacy and
accessibility. What about heat, water spray and exposure to corrosive
elements for equipment, other natural conditions.
• "Diagrammatic floor plans, sections and elevations for new structures" -
What level of detail? Scale? A minimum of how many of each per structure?
Specific studies for specific structures? What about separate rooms within
the structure? What about changes/revisions if Oppenheim doesn't get it
right? Shouldn't similar considerations of sightlines/views, wind currents,
natural light, etc., be taken into account for these deliverables as they are for
the site plan. I keep thinking back to the door clearance heights at Zorro not
having taken into consideration dust blow, for example.
• "Program Area calculations - Specifically what calculations?
EFTA_R1_00007465
EFTA01733579
• "Inspirational images" - ?
• "Professional Renderings [by third party]" - why a third party? If
Oppenheim can't do renderings, why is it charging so much? You are being
asked to pay $4,000 per rendering, payable to Oppenheim in advance, for
third party renderings. Nuts.
• Shouldn't there be a 3D site plan including topographical features?
• What about a 3D model of the Island? So you can better visualize?
4. Section 1.4 Compensation
• $100,000 seems high for what Oppenheim is providing and the reservations
it makes for additional time beyond 6 weeks and significant increases in
program area and complexity. It seems high in light of Oppenheim's charging
you for third party renderings costing $4,000 each, where Oppenheim makes
no mention of site visits or meetings, where there is a lack of specificity of
deliverables, and no mention of revisions or changes to deliverables, and
where there is no specificity of the number and skill level or experience of
the designers to be used for the project.
• There is a provision in Section 1.4 that you will have to pay $25,000 per
week for any additional design services beyond the 6 week period outlined in
the proposal. This language is very unclear. It is also crazy. What ifit takes
more than 6 weeks to complete the Initial Concept Design? What if the
reason for that is Oppenheim understaffs the project? In addition, you
should not be paying on a weekly basis for anything. To the extent that
additional services are rendered there should an agreement in advance of
total cost of the additional services and a payment schedule agreed upon for
the same. If there are some things that defy estimation for any reason then
you can go with the hourly rate schedule that Oppenheim provides, but only
if and when Oppenheim specifies to you in writing the work that is not
included, and gets your advance written approval of payment for that work
on an hourly basis. You should note that Oppenheim provided a rate
schedule that seems pretty high ($150 for designers, $250 for sr. designers,
$300 for project manager/team leader, $350 for senior project manager, and
$500 per principal) and that Oppenheim's hourly rates increase by 10% per
year.
• The fee should not be based on 6 weeks. It should be based on stages of
completion of the Initial Concept Design phase and satisfactory deliverables
at each stage. E.g, 1/3 in advance, 1/3 when design development finalized
and Oppenheim delivers a final approved detailed written program with
certain key drawings that you think are appropriate to ensure that
Oppenheim has captured what you need for each building and 1/3 upon your
satisfaction with the final Concept Design Deliverables.
• The 6 weeks is fine as a deadline, but should not determine the amount of the
fee. At the very least there should be some holdback from the $100,000 and
penalty if the work is not completed within 6 weeks.
EFTA_R1_00007466
EFTA01733580
5. Reimbursable expenses:
• The proposal requires you to reimburse Oppenheim for "all travel
related expenses" including, but not limited to, "lodging, business
class flights, transfers and visas" - There should a "reasonable"
requirement is business class necessary? To what transfers and visas
is the proposal referring. The project is in the USVI and Oppenheim is
located in Miami. If anyone from Oppenheim's team requires a visa,
that is Oppenheim's issue, not yours. How many will be traveling and
who? To avoid paying for an unnecessary entourage, there should be
a requirement of written pre-approval of all travel and lodging. We
should also consider a provision that travel and lodging will be
handled by you, so that you can book it, ensure best pricing and if you
use your credit card, get points.
• Third party professional renderings at an "estimated" $4,000 per
rending are not included in the services provided by Oppenheim.
Oppenheim will present proposals to you for approval and you must
pay the full amount of the proposal to Oppenheim in advance. Apart
from the point above that Oppenheim should provide you renderings
at no additional charge, this suggests that this may be an area where
Oppenheim is taking some kind of Vig on third party rendering
charges.
• The proposal also provides that Engineering and other consultancy
services are not part of the proposal, that Oppenheim won't be
responsible for any such Licensed or insured engineers or client
consultants. The proposal provides a list of the types of engineers and
consultants that may be required. Why is the list so broad?
Shouldn't Oppenheim know by now what, if any, engineers and
consultants will be required for the initial concept design phase?
Should any of this work be done in house and be included for the
$100,000?
6. Intellectual Property:
Oppenheim provides in its proposal that all intellectual property rights in the
drawings, renderings, models, specifications, electronic files (including, but not
limited to, CAD files, spreadsheets and databases) and other derivations that are
part of the project belong to Oppenheim and are intended only for use with this
project. It also provides that you are not allowed to use any of these materials on
future phases of the project (i.e., beyond the Initial Concept Design phase) or on
other projects, except if Oppenheim agrees and gets compensated for it. In addition,
Oppenheim provides that if you desire to use any work product by Oppenheim
without the further involvement of Oppenheim then you are required to pay
Oppenheim a licensing fee of $500,000.
EFTA_R1_00007467
EFTA01733581
This is absolutely insane. Oppenheim is charging you $100,000 for the Initial
Concept Design. Once you pay Oppenheim, you should own all the work and all
intellectual property rights (other than moral rights which legally can't be assigned)
in the work that Oppenheim provides. You should be able to use all that work as
you deem appropriate without having to get permission or having to pay anything
further to Oppenheim. If Oppenheim is concerned about liability for use of its work
other than as intended then you can give Oppenheim a limited indemnity or hold
harmless for any use of the work outside of its intended purpose.
EFTA_R1_00007468
EFTA01733582
ℹ️ Document Details
SHA-256
e08252be8ad23e621edfa2a0769b1c879c76e0e6c82f86942632244cfc936498
Bates Number
EFTA01733577
Dataset
DataSet-10
Document Type
document
Pages
6
Comments 0