📄 Extracted Text (157 words)
From: Amy Dempsey
To: Jeffrey Epstein <[email protected]>
Subject: Status
Date: Wed, 06 Mar 2019 12:23:11 +0000
It is probable that Jonathon Pempek USACE will be coming down on the I I th. USACE regulatory has been giving him some push back
on processing of the dock permits(and on several other non compliances he has settled). I will be talking to him about what needs to be
done to get things moving forward again. I know CZM had raised issues on the applications and the temporary ramps. Has there been a
resolution? I want to check on what is happening but did not want to stir the pot so to speak if a resolution is in the process.
On the cable side we are less than a month away from both the CZM permit and the USACE permit.
Amy Claire Dempsey, M.A.
President, Bioimpact, Inc.
P.O. Box 132 Kingshill
St. Croix U. . Vi 'n Islands 00851
EFTA01031357
ℹ️ Document Details
SHA-256
e405a634cfec30e7c6d8019ecb8dd3f81eb1e27b8b395a0fda95cb477acb950e
Bates Number
EFTA01031357
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0