14 It)
THOMAS A. FENNIM AN
ARCH ITECT
Facade Inspection & Safety Program
Cycle 8A Report
for
9 East 7151 Street
New York, NY 10021
August 2015
ONE UNION SQUARE WEST. SUITE 501. NEW YORK. NEW YORK 10003 •
TEL • FAX 212.414.0249
EFTA01083963
9 East 71" Street August 2015
Facade Inspection & Safety Program Cycle 8A
As per our agreement with the Owner of the subject building, we have completed a critical
examination of the subject building in order to comply with NYC Construction Code section §28-302 that
mandates the periodic inspection of the exterior walls and appurtenances of buildings greater than six
stories in height by a Qualified Exterior Wall Inspector (QEWI). The inspection was performed and
completed in accordance with RCNY 103.04.
Executive Overview
Summary ofFindings:
The building is currently inspected as Safe.
Conclusions and Recommendations:
Based on the Safe status of the building there are no immediate recommendations required within the next
5 years.
Categorization ofBuilding: SAFE
Report of Critical Examination
Property Information
A. Address of CriticalExamination: 9 East 71" Street, New York, NY 10021
• Nearest cross streets to the building: Between Fifth Avenue & Madison Avenue
• BIN#: 1041354
• Tax Block: 1386
• Tax Lot: 10
• Zoning District, Map: RSB, Map 8c
B. Building Owner: Maple Inc
9 East 71" Street
New York, NY 10021
Richard Kahn, Treasurer
T:
E:
C. Building Description:
• Number of Stories: 7 stories + cellar
• Height of Building: 120 feet
• Plan Dimensions: 50%0" wide x 921-0" deep
• Certificate of Occupancy number: #101428
• Usage: Residential
• Age of Building: 1910
• Type of exterior construction: Stone & Brick Masonry
• Landmark Status: Upper East Side Historic District
D. Settlements, repairs, and revisions to exterior enclosures since previous report
• None
2 of 8
EFTA01083964
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle SA
Methods Used to Conduct Inspection
E. Critical Examination Procedures
1. Review ofPrior Reports: Prior to examining the exterior walls, the most recent
report and any available previous reports were
carefully reviewed.
2. Visual Examinations: Binoculars and a telescopic camera were used to
conduct a visual inspection of all exterior facades.
These include the 71' Street facade, East, West and
Rear facades.
3. Physical Examinations A physical examination (close-up inspection) was
conducted via scaffold / and terraces from grade to
top of the 71'' Street facade. The location of the
physical examination is noted on the attached plan.
F. Description ofExaminations:
1. Riggers Information: Andrew Rosenwach
Herbert Rose Inc.
40-25 Crescent St.
Lon Island Ci , NY 11101
T:
#5739
3. Location Diagram: Refer to attached plot plan.
4. Date ofInspections: June 24, 2015
Summary of Findings
G. Conditions Observed
1. Significant Deterioration & Movement: None.
2. Apparent Water-tightness: The roofs, bulkheads & facades inspected during the critical
examination appear, by the methods used to conduct the inspection, to be watertight. The building
Manager reported that there are currently no active leaks attributed to the building envelope.
3. Classification of Conditions:
• Unsafe Conditions: None; No UNSAFE conditions were observed.
• SWARMP Conditions: The following conditions were noted to be safe with a
repair and maintenance program (SWARMP). These conditions should be repaired
within five years (prior to the next critical examination) to ensure they do not
deteriorate into unsafe conditions. Should these conditions not be remedied prior to
the next critical examination, they will automatically be deemed unsafe. The owner
of the building is responsible for ensuring that the conditions described in the critical
examination report as SWARMP are repaired and all actions recommended by the
QEWI are completed within the time frame recommended by the QEWI, and are not
left to deteriorate into unsafe conditions before the next critical examination. It is the
owner's responsibility to notify the Department of any deviation from the timeframe
to make corrections as specified in QEWI's report. Such notification shall be
accompanied by supporting documents from the QEWI justifying the request for a
new time frame.
3 oft
EFTA01083965
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle SA
None; No SWARMP conditions were observed.
• Safe Conditions: The following conditions were noted to be safe.
These conditions need not be addressed at their current state, but should be tracked to
ensure they do not begin to deteriorate into unsafe conditions after a five-year period.
Condition Façade Floor Photo
Open mortar joints - South Facade 3'd 8
and 4th 9
Open joints at metal flashing - 4ih Floor Cornice at' 10
South Facade
4. Exterior Appurtenances: The following exterior appurtenances were noted to be safe.
• Exterior fixtures
• Parapets
• Copings
• Guard rails
• Balcony enclosures
• Window frames (including hardware and lights)
• Window guards
• Communication equipment (ie: wires, satellite dishes, etc)
5. Safe Conditions Requiring Monitoring / Routine Maintenance: None.
H. Causes ofSIVARMP Conditions: N/A.
I. Status ofExterior Maintenance: N/A
Report of Findings and Recommendations
.1 Comparison of Cycle 7 & Cycle 8 Reports:
Previous cycle report status: SAFE
Initial Filing Date: February 17, 2012
1. Open ECB Violations: None.
K. Schedule ofRepairs and Maintenance ofSWARMP Items:
1. Repair Items: N/A; No SWARMP items.
L Required Permits: N/A
M. Photographs: Refer to attached photograph&
N. The classification of the Building
for the Current Report Filing is: SAFE
Professional Seal and Signature
4 of 8
EFTA01083966
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle SA
This report is prepared solely to comply with Section §28-302 of the Administrative Code of the City of
New York in accordance with the rules and procedures of the Commissioner of Buildings of the City of
New York. Opinions expressed herein reflect only conditions present at the time of Critical Examination.
The report is not intended as a specification for repair nor is it to be used as such to obtain bids for
repair.
The Architect (QEWI) assumes no responsibility for the adequacy of design or construction of the original
building, nor for the adequacy of alterations, repairs or maintenance of this building in the past, present or
future by Contractors or maintenance personnel.
The building was inspected for compliance with the Facade Inspection and Safety Program requirements
only and this report should not be construed as presentation as to the conditions of any other building
components including but not limited to the roof structure, drainage system, flashings, stairs, exits or
elevator system.
A copy of this report has been submitted to the Owner prior to filing with the Department of Buildings.
Signed: Date:
Thomas A. Fenniman, Architect
Appendices
1. Photographs
2. Location (plot plan) diagram
3. BIS Property Profile Overview
4. BIS Facades Page
5 of 8
EFTA01083967
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle SA
Photographs (06/24/2015)
I . View of South (East 7151 Street) façade.
6 of 8
EFTA01083968
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle SA
2. Detail view of Southeast Corner (East 7I g Street) facade.
3. View of east side of east chimney and elevator bulkhead.
7 of 8
EFTA01083969
9 East 71" Street August 2015
Facade Inspection & Safety Program Cycle SA
4. Detail view of 4ib Floor Balustrade.
5. View of 4th floor cornice brackets in good condition.
8 of 8
EFTA01083970
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle 8A
6. Replacement and patched stone at 4ib floor cornice.
7. Patched stone at 3n1 Floor southwest corner bandcourse.
9 of 8
EFTA01083971
9 East 71" Street August 2015
Facade Inspection & Safety Program Cycle SA
8. Partial open joint at upper portion of 4ih floor band course.
9. Partial open mortar joint at 3" Floor.
10 of 8
EFTA01083972
9 East 71" Street August 2015
Facade Inspection & Safety Program Cycle SA
10. Partial open joint at metal flashing above 4th floor cornice.
11. Detail of carved stonework above entrance in good condition.
I1 of g
EFTA01083973
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle 8A
12. Evidence of rusted metal at underside of 3rd Floor metalwork.
13. West face of southeast chimney.
12 of 8
EFTA01083974
9 East 7I" Street August 20t5
Facade Inspection & Safety Program Cycle SA
14. South view towards southwest chimney.
15. Main flue at northeast corner.
I3of8
EFTA01083975
9 East 71" Street August 2015
Façade Inspection & Safety Program Cycle gA
I WWI
ts,gt I anti 3,31111/ I
---agggggaaaepa4L...:yd J-318/a
is i
ig
16. North face of elevator bulkhead with metal flue in good condition.
17. Southwest corner of Elevator Bulkhead.
as
14 of 8
EFTA01083976
ℹ️ Document Details
SHA-256
e45c96e0f56c7c208c4e24ed11fd8d567dd4a002f2aa588f33a831bdb2d8cf28
Bates Number
EFTA01083963
Dataset
DataSet-9
Type
document
Pages
14
💬 Comments 0