EFTA01864747.pdf

DataSet-10 1 page 116 words document
P23
👁 1 💬 0
📄 Extracted Text (116 words)
To: Jeffrey [email protected] Cc: Emad Hanna[ From: Gary Kemey Sent Mon 5/16/2011 6:38:33 PM schedule for the 4th Main pool the building slab will be poured and block going up the pool equipment will be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes after the building is stoned) still on target for 10/3 Flag pole pool the building will be framed in and plastering underway the pool equipment will be in and water in the pool (assumes we get tile selection) the deck will be concrete(tile happens after shelter and plaster) walls will be underway still on target for 9/15 EFTA_R1_00267193 EFTA01864747
ℹ️ Document Details
SHA-256
e5e12ff2e66f81d9b1faa33807ff844270f78c8831b45c4a1410e02c58041abd
Bates Number
EFTA01864747
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!