EFTA02620154.pdf

DataSet-11 3 pages 426 words document
👁 1 💬 0
📄 Extracted Text (426 words)
From: Richard Kahn < Sent: Friday, October 5, 2018 7:42 PM To: Jeffrey Epstein Subject: Fwd: Jeffers Road pricing Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 tel fax 212-320-0381 cell Begin forwarded message: From: =/b>Kyle reavis Subject: =/b>Re: Jeffers Road =ricing Date: =/b>October 5, 2018 at 1:49:14 PM =DT To: =/b>Richard Kahn <a Cc: Daphne Wallace < >, brice gordon Rich, Not yet. As soon =s we get his pricing and approve it we can get him started. The =orm work on those two roads should take around 3 weeks and the pours =an be done over 2-3 days for each. Either we wait for the =armix or we pay for concrete from St Thomas (through =effers). Kyle On Fri, Oct 5, 2018 at 10:09 AM Richard Kahn <rnailto: > wrote: has=jeffers sent pricing? how soon can this work be done? carmix truck looking more like arrival late November as it is =ot leaving Europe until 10/15 EFTA_R1_01825753 EFTA02620154 Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 tel fax 212-320-0381 cell On Oct 4, 2018, at 1:42 PM, Kyle reavis wrote: Good Afternoon Rich, Jeffers is promising us =ricing by tomorrow on the road from gorilla to the sun dial, along with =he road from the beach to the flag pole pool. I told him to price =p two options for us for each section of road; Option A: For Heavy =raffic #4 Rebar reinforced 12" =/C 4" Thick PSI - Above =500 - Below 5000 (I want to see what he suggest) Saw=Cutting to match existing concrete roads Option B: For Light =raffic 6" Mat reinforced 4"=thick PSI - Above 3500 Saw cuts to match existing concrete roads He also asked me about =hen our Carmix truck will be on LSJ and I told him hopefully by the =eginning of November. He is planning on using it, however we will =ave to have our guys operate it and mix the mud. that being said =f we are going to be supplying the aggregates in actuality he will only =o the formwork and finishing. His price per yard calculations =ill not apply anymore unless he has his own trucks. We will see =hat his numbers come back like and I will suggest the best way to =roceed with him, it might make more sense to pay him on a price per =oot for forming and finishing. Let me know what you think. =hanks! Very =espectfully, Kyle Reavis 2 EFTA_R1_01825754 EFTA02620155 3 EFTA_R1_01825755 EFTA02620156
ℹ️ Document Details
SHA-256
e712ff4e91bc7835e5fa8c11154182baa2ccc631f223b91d6c2a848a689cee2a
Bates Number
EFTA02620154
Dataset
DataSet-11
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!