📄 Extracted Text (639 words)
Punch List — June 11. 2012
1. Five Palms —TOP PRIORITY
- Exterior Door Shutters — removanle option
- Painting Outside to be completed after visit
- Furniture —Sofa — leather samples JE will review while on site
piano needs tuner
- lights — - Add two more lights to front of Five Palms in trees
- Mirrored siding — Panels ordered — EDA to Tropical FL 6/7 — scheduled to sail 6/8, EDA on STT 6/12
Glue on site
- Tapestry Molding for Ceiling —ion- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 —
temporarily powered by generator
- Flooring
- Fire pit — gas and needs retrun and reoreder
- Books— books on site will relocate over the week of 6/4
- Benches — one bench to west north of fire pit
- Road grading
- Piano — at Tropical FL 6/8 — scheduled to sail 6/13, EDA on STT 6/16
2. Grotto -
- Floor resin
- Genset wiring — scheduling to be determined
3. Berm/Tor of Hill
- dirt and rock needs on top of hill needs to go ASAP
- hydroseed top of hill
— 4 large planter boxes with small planter inside require construction — size to be determined by JE
- cleanup and excavate — continues
- remove rock screener — completed
- run power to berm center from pull box
4. Engineering/Maintenance Yard
- Steel Shed — foundation in progress
- Metal Sheets on old building will be replaced week of 6/4
5. Triangle — landscaping direction required from JE
6. Flagoole Pool Cabana -
- Recovering of sofa/chairs —
- Furniture — needs new des review another piece of furniture — Sarah
7. Entry Tree Lights — installation complete
8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction , wall built
9. Tiki — Darren is contacting the vendor regarding the shields
10. Dock —
- Decking — replace all damaged boards and carpet complete
- Floating Dock -
- Jet ski Docking - review
- Table/Dock Box — Bill starting 6/4
11. Kite House — review of wooden outside furniture - Sarah
12. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
13. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
14. Mechanical Building
- Replacement Transformer — approved to purchase — ordered
15. Boats
EFTA01107290
- Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine
- PRD — sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
16. Gym Road - road grading after Five Palms — continues
18. Timers— review installing timers on air conditioners, irrigation water systems, and lights
20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
21. Pergolas— construct 3 pergolas for benches at the top of the hill —continues
22. Main entrance/gravel/grade - complete
24. Wind Door — wind door on kitchen side needs adjusting
- wind door stops
25. Landscaping — gardenias
26. Solar lights
27. Roads — grade all roads — Wednesday 6/6 — Tom - please review all roads so you can pitch, drain, with Jules
and Craig
28. Library — lights on bookshelves need attention
- temperature?
29. Main hill — asphalt path
30. Master Suite —
- Large master bed planting
- Door in dressing area — the heavy mirrored door between the bed and bath is beginning to drag on
the floor
- Add door handles to shutters on master bedroom door to be able to close from inside
31. Phones —
- Library terrace — phone does not work
- Flagpole — phone in cabana has all the wrong numbers as compared to the list on speed dial
32. Media —
EFTA01107291
ℹ️ Document Details
SHA-256
e727e1b506dbef146c5c723e6390f60e653b5d934df9ef51be3fe7915c1e4393
Bates Number
EFTA01107290
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0