EFTA01109731.pdf

DataSet-9 2 pages 261 words document
👁 1 💬 0
📄 Extracted Text (261 words)
MAKING EVERY DROP COUNT U.S. Vinzin Islands Operations www.isgwatcr.com 650E Red Hook Plaza. Suite 201 St. Thomas. Virgin I Dec 12, 2013 Ms. Ann Rodriquez Little St. James Island USVI. Ann, As requested, I have put together a preliminary quotation to replace the non- functioning touchscreen on the LSJ SWRO system. Please note that the screen failed due to what I am being told was a high pressure run event that burst three high pressure lines on the system spraying the MC panel with salt water. It is impossible to run the system without the screen , so I cannot say if this is the only issue with the SWRO system, and we may or may not have further issues after we replace the TS and restart the plant. TOUCH SCREEN REPLACEMENT: 1. Siemens 6AV6 643-0CD01-1AX1 Touchscreen panel: Cost: $ 3,348.80 2. Programming costs for new touchscreen: Cost: $ 200.00 3. IT support from Gainesville during installation: Cost: $ 435.00 4. 8 hrs. Labor for USVI Technician to install, start, and service LSJ SWRO system: Cost: $ 800.00 TOTAL COST: $4,783.80 This is a "site specific" repair, and we will need approval and a check for the total amount listed above before proceeding with ordering the touchscreen and programming. PLEASE NOTE: Any additional Labor Costs are billed out at $100.00 per hour. Any other labor not listed above will be charged separately. Respectfully, Patrick Adams USVI Operations Manager Georgia • Florida • US Virgin Islands • British Virgin Islands • Anguilla • Turks and Caicos • Bahamas EFTA01109731 Page 2 EFTA01109732
ℹ️ Document Details
SHA-256
e72bcc9f83a1fea1818ed2eadf5703bb67671ffd35065e7b0487314b8043580e
Bates Number
EFTA01109731
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!