EFTA01811618.pdf
👁 1
💬 0
📄 Extracted Text (296 words)
To:
Fran: Jeffrey Epstein
Sent Thur 4/22/2010 10:12:19 PM
Subject Re: Library Courtyard
You don't want to drive down the road and meet the pattern on the seam .. i think we should
double the size of the pattern„ and come in on the road in the middle of a large square , not on a
seam
On Thu, Apr 22, 2010 at 5:58 PM, a wrote:
What do you think? It seems so much more appropriate and it actually is similar to the
pattern used on the cabinet of the library from The Escorial... Actually Abram could
you send a copy of the picture with the courtyard pattern?
From
To:
CC.
Sent: 4/22/2010 5:55:16 P.M. Eastern Daylight Time
Subj: Library Courtyard
Gary:
Enclosed is our proposal for the Library Courtyard.
As noted on drawing, the border on the perimeter is concrete with medium-size exposed
aggregate, the grid is local pebbles imbedded in cement and the field is broom sweep gray
concrete (as used in original design).
The current concrete border along the perimeter will need to be adjusted to achieve this pattern.
Let us know what you think.
Best,
ABRAM MULJANA
EFTA_R1_00181420
EFTA01811618
ROBERT COUTURIER. INC.
69 MERCER STREET. 3RD FLOOR
NEW YORK. NY 10012
****** ************ WE*** ***** *****************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jecvacationOgmail.com and
destroy this communication and all copies thereof,
including all attachments.
EFTA_R1_00181421
EFTA01811619
ℹ️ Document Details
SHA-256
e74af5d6c449218fd409338758d9701fcd111b4721577b678802c47580998a31
Bates Number
EFTA01811618
Dataset
DataSet-10
Type
document
Pages
2
💬 Comments 0