APPLICATION AND CERTIFICATE FOR PAY
MENT AIA DOCUMENT G702
TO CONTRACTOR: Lafayette Contractor% LLC PATO I OF 2 FACES
PROJECT: LSI Mechem:al LltelIsaa APPLICATION NO.: 5
6100 Red Hook Quarto Sure A2.7 OMEN/too To:
S? Thomas. USVI 00102 PERIOD TO: 2LFeb-09 OWNER
PROJECT NO.: ARCH/IF-CT
FROM: Newnan d Moll Concerto Contractors, Inc. X CONTRACTOR
723 NOM St, Stile I VIA CM: CONTRACT DATE
Richmond. Maine 01357 SUBCONTRACT NO.:
COLD RAC.T 10R: Cast in plea coca=
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in The und.csigned Contractor certifies tbst to the best of the Connuctor's laouied
connection with the Contract ge, info-
Continuation Shed. AM Document G703 is ittaChe forma ion and belief the Work anted by this Applica n far Payment has bete
d. conapieted
in accordance with the Cottram Dom:meets , that all anautits hare been paid
by the
I. 0 RIGLNAL CONTRACT SUNI... . Contra& for Work for v.-kith previous Certificates for Paymen
689,00000 ments received Dorn &Owner, and that the current payment shown t were Oared sod pay-
2. Net Change by Change Order.. bean is now that
CON CTOR:
3. CONTRACT SUM TO DATE ( Line I - Line 2 )
4. TOTAL COMPLETED & STORED TO DATE..........
(Cob= G on G703)
.. S
689.000.00
548,592.40
B
of
fi Da:a _Way
County of:
s. RETAENAGE:
Subscribed and swam to before
a. jid% of Completed Work
V il*-4-4 ne this day of
( Column D E on G703)
b. 10% of Stored Material
( Column Pon 0703 )
Notary Public:
Total Retainage ( Line 5a + 51, or
90 `eit
34 f5&O0
My Commission Expires:
6. TOTAL EARNED LESS RETALNAGE .........
( Line 4 less Line 5 Total )
................ S —striar4r CONSTRUCTION MANAGERS CERTIFICATE FOR PAYM
ENT
7. LESS PREVIOUS CERTIFICATES FOR 49 3;7 ;3. 14i In accordance with the Contest Docnnxids, bona on on-site carnations and the data
PAYMENT core-Qrising thO application, & Architect cedilla to the Comm
(Line 6 From prior Certificate). that to the best of the
379,699.60 Are.iteefs keosiedge, information and belief the Work has
propessed ss indicated, the
8. CURRENT PAYMENT DUE . . . . . . s
1‘4, r quality of the Work is in accordance with the Conine%
is entitled to meant of the &NOUN:ICERTIFIED.
Documents, and the Ccetraetor
9. BALANCE TO FINISH, INCLUDING RETALNAGE
(Line 3 Less Line 6 )
esti
kg 5;11A•673
e,3.5
areetto,t, AMOUNT CERTIFIED
( Attach omit:oration if amow,t aotilled differs from
S #42.8)
amount applied for. Initial
CHANGE ORDER SUMMARY all figura on this application and me the Confirmation Skeet
ADDITIONS DEDUCTIONS that are changed to
Total changes a conform to the montt cartrfi
td in
previous months myna S -
CONSTR
S - By.
Total approved this S Dale:
- S - This C
TO rms s is not cegonablc. The A, ousrr CIMTFIED: payable
- S - Contractor nerrad bends Issuance. Parma only to the
NET CHANGES by clans order S : and accePtance aPartzni am withc91
- mejolic' to any rights of the Oster ar Coen-x:0r iScr this Cout--a
t.
AlA Document C 702
G7U2.1992
EFTA00610437
Continuation Sheet AlA DOCUMENT G703 PAGE 2 OF 2 PAGES
AlA Document G702, APPLICATION AND GERI LPICATE FOR PAYMaNIT. APPLICATION NO.: 5
containing Conn-actor's signed Certification is attached. In tabulations APPLICATION DATE 25-Feb-09
below, =mats are stated to the nearer dollar. Use Color:all on PERIODTO 28-Feb-09
Contracts where variable multiage for line item may apply. PROJECT NO.:
A a C D e F 0 II I
WORK COMT.STED MATERIALS TOTAL
REM ECSCRIPTION OF w0ItE SCILEDULED IRON ntnvv;)us 2103 MUDD PRUENTLY CMIPLETED % DALAXLT ARTADIADE
W. VALUE AP11.1CATKR: STORED ANT) STORED (0! E.) To fir VARIABLE
( D • II ) (NOTES' TO DAM FLNISII RATE)
DorE) (D•E•F) ( C - 03
1 Mobilintion $ 20,000 S 20,000.00 S :topoomo 100%
- S • $ S -
2 Reinforcing Steel S 125,000 S 106,250.00 S ' I8,750.00 S • 5 125,000.00 100% S -
3 Base slab - Labor S 40,000 S 40,000.00 S - S - 5 40,000.00 100% S -
4 Base slab - Matrrial S 3,000 $ 3,00900 $ - S - $ 3,000.00 100% S -
5 Walls C3' - Labor S 17,000 $ - S - S - S - 0% 5 17,000
6 Walls<8. - Mataiil S 2.000 $ - S - S S 0%
- S 2,000
7 Walls>81- Labor $ 140.000 S 84,000.00 5 `35,000.00 $ - S 119,000.00 85% S 21,000
8 Walls>8' - Material S 14,000 S 8,400.00 S . 3,500.00 S S 11,900.00 85% S 2.100
9 Suspended Slab - Labor S 120,000 $ 24,000.00 $ 36,000.00 $ • 60,000.00
S SVY. S 60,000
11 Suspended Slab -Material S 19,440 S 3,888.00 S 5,832.00 S - S 9,720.00 50% S 9,720
12 Misc. Pads - Labor $ 8.000 S 8,000.00 S - S - S 8,000.00 100% S -
13 Misc. Pails • Materials S 1,000 S 1,000.00 $ $
- • $ 1,000.00 100% $ -
14 Equipment S 152,000 S 98,800.00 S 30,400.00 S - S 129,200.00 85% S 22,800
15 Gross Receipts S 27,560 S 16,811.60 S . 4,960.80 S 21,772.40
• S 79% S 5,788
16 S - S - S • S S - 0% S -
17 S - S - S - S - S - 0% $ -
18 $ - S S - S - S - 0% $ -
19 5 - $ - $ - 5 - 5 - 0% S -
20 S S - S - $ - $ - 0% S -
S 689,000.00 S 414,149.60 S 134,44220 $ S 548,592.40 S 140,408 $ .
A1A DOCE'3117NTDiv
G703-1992
EFTA00610438
ℹ️ Document Details
SHA-256
e753692aa0bc7e5b50492e0b029338ed33da31d8de7b97d02344b46947bafaaa
Bates Number
EFTA00610437
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0