EFTA01005625.pdf

DataSet-9 2 pages 204 words document
D1
👁 1 💬 0
📄 Extracted Text (204 words)
From: Lany Visoski To: Je vacation <jeevacation®gmail.com> Cc: Rich Kahn c: la>, Larry <I.a> Subject: Bell 430 annual Date: Tue, 17 Jul 2018 14:51:44 +0000 Attachments: C015629FL_-_ITEMS.PDF; attachment_l.pdf Jeffrey For you approval, Bell 430 annual: Parts-$134,383.28 Labor—$ 59,553.00 Overhaul 2 Passenger window due to growth of algae in window pane $16,950.00 Discount (-$4,329.00) Total for annual including windshield and Cabin window overhaul $206,557.28 Is this approved to fund? Thank you, Lany Bell 430 Break down High dollar items: 2 Passenger window overhaul due to Algae growth $16,950.00 (windshield $56,803) (Main rotor shear Pins $37,572.66) (Main Rotor Shear pin clamps $20,286) 1-windshield change: —Windshield—$32,818.00 Installation labor— $23,985.00 2-Main Rotor Shear Pins -$ 37,572.66 3-Labor to install Main rotor Shear Pins-$ 9,360.00 4-Main Rotor Sheer restraint clamps-$20,286.00 2-transponder inop. $ 7,594.00 3-Com Radio replaced $ 1,819.00 4-GPS battery replaced $ 2,105.00 5-Pitot static Check Altimeter $ 4,662.00 6-Annual inspection Flat rate $ 21,645.00 7-annual inspection parts kit $ 3,260.84 8-Main RotorPitch link rods replaced -$ 7,120.00 9-replace Collective Idler bolt $ 2,223.00 10-Main rotor Yoke pad $ 2,275.07 11-replace Nose wheel (corrosion)—$ 2,284.75 12-Paint work around new windshield $2,343.00 Total from breakdown $181,353.32 Misc items $8,253.96 Total for annual $189,607.28 EFTA01005625 Sent from my iPad EFTA01005626
ℹ️ Document Details
SHA-256
e77923aff03507b9a861d696b1644e4e84aa8b3225032f2c12e09351588d9046
Bates Number
EFTA01005625
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!