EFTA01005625.pdf
👁 1
💬 0
📄 Extracted Text (204 words)
From: Lany Visoski
To: Je vacation <jeevacation®gmail.com>
Cc: Rich Kahn c: la>, Larry <I.a>
Subject: Bell 430 annual
Date: Tue, 17 Jul 2018 14:51:44 +0000
Attachments: C015629FL_-_ITEMS.PDF; attachment_l.pdf
Jeffrey
For you approval, Bell 430 annual:
Parts-$134,383.28
Labor—$ 59,553.00
Overhaul 2 Passenger window due to growth of algae in window pane
$16,950.00
Discount (-$4,329.00)
Total for annual including windshield and Cabin window overhaul
$206,557.28
Is this approved to fund?
Thank you,
Lany
Bell 430 Break down High dollar items:
2 Passenger window overhaul due to Algae growth $16,950.00
(windshield $56,803)
(Main rotor shear Pins $37,572.66)
(Main Rotor Shear pin clamps $20,286)
1-windshield change: —Windshield—$32,818.00
Installation labor— $23,985.00
2-Main Rotor Shear Pins -$ 37,572.66
3-Labor to install Main rotor Shear Pins-$ 9,360.00
4-Main Rotor Sheer restraint clamps-$20,286.00
2-transponder inop. $ 7,594.00
3-Com Radio replaced $ 1,819.00
4-GPS battery replaced $ 2,105.00
5-Pitot static Check Altimeter $ 4,662.00
6-Annual inspection Flat rate $ 21,645.00
7-annual inspection parts kit $ 3,260.84
8-Main RotorPitch link rods replaced -$ 7,120.00
9-replace Collective Idler bolt $ 2,223.00
10-Main rotor Yoke pad $ 2,275.07
11-replace Nose wheel (corrosion)—$ 2,284.75
12-Paint work around new windshield $2,343.00
Total from breakdown $181,353.32
Misc items $8,253.96
Total for annual $189,607.28
EFTA01005625
Sent from my iPad
EFTA01005626
ℹ️ Document Details
SHA-256
e77923aff03507b9a861d696b1644e4e84aa8b3225032f2c12e09351588d9046
Bates Number
EFTA01005625
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0