EFTA01799325
EFTA01799326 DataSet-10
EFTA01799329

EFTA01799326.pdf

DataSet-10 3 pages 555 words document
P17 V16 P19 D4 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (555 words)
From: Richard Kahn < Sent: Sunday, May 1, 2016 9:11 AM To: Jeffrey Epstein Subject: Fwd: Great St James Richard Kahn HBRK Associat=s Inc. 575 Lexington Avenue, 4th Floor New York NY 100=2 Tel Fax Cela Begin forwarded message: From: Hugo Hodge Date: April 30,=2016 at 8:38:50 PM EDT To: Richard Kahn < Subject: =e: Great St James <=iv> With the greatest respect for you and your client, I'm sorr= but HKT will have to respectfully decline to accommodate that offer. =/div> Apparently you have someone off island, unaware of=the local requirements and hopefully the cost you are expecting to pay will=not increase when they acquire that knowledge. $50= is more than 50% below the proposal and, for lack of better words, quite u=acceptable and insulting. Should you run into diff=culties with your other option HKT stands prepared to deliver first class r=sults as described in our written and verbal communication. O= Apr 30, 2016, at 4:04 PM, Richard Kahn < >> wrote: Thank you. Richard Kahn HBRK Associate= Inc. 575 Lexington Avenue, 4th Floor New York, NY 1002= EFTA_R1_00137947 EFTA01799326 Tel Fax Cell On Apr 30, 2016, at 10:27 AM, Hugo Hodge > wr=te: Good m=rning Mr.Kahn, I have thoroughly reviewed your sug=estions for modifications to the bid and given your request great considera=ion. I honestly believe that the items you requested are important for a su=cessful project. For example, the witnessing of the factory acceptance is n=t a step I would recommend omitting. With that sa=d, the items you suggested to remove total $23,000. To ensure the integrity=of this project I am willing to do the project with the entire scope at the=original price less $23,000 for a total of $80,000. If you decline this opt=on and are convinced that these items should be omitted, I am willing to re=uce the remaining items by 10% resulting in a cost of $72,000 for the revis=d scope. I strongly recommend you consider the fi=st option but I am willing to discuss this further with you if necessary.</=iv> Best Regards, Hugo Hodge Jr=/div> On Thu= Apr 28, 2016 at 12:32 PM, Richard Kahn <an; wrote: it was a pleasure speaking with you earlier. as discussed t=e following areas are scopes that will not be needed and my comments: a) conceptual design on cable routes - ok to keep - pl=ase revisit pricing b) detailed cable specs and preparation o= bid docs - ok to keep - please revisit pricing c) derailed switch and meter design and prep of all switches and metering device - =nbsp;ok to keep - please revisit pricing d) review all swi=ch and cable bid submittals and submit to Wapa for approval - ok to=keep - please revisit pricing e) witness factory acceptance t=st - not necessary as all we need is for you to review test from manufac=urer and should be included in d) above f) complete final des=gn to include civil and electrical drawings - ok to keep - please r=visit pricing g) witness installation and test electrical dev=ces - not needed h) complete as builts - not neede= i appreciate your effort in revisiting y=ur pricing and look forward to hearing back from you this afternoon thank you Richard Kahn 2 EFTA_R1_00137948 EFTA01799327 HBRK Associates Inc. =75 Lexington Avenue 4th Floor New York, NY 10022 tel cel 3 EFTA_R1_00137949 EFTA01799328
ℹ️ Document Details
SHA-256
e81675a7900177c8f117ac5dae81db7d1fb6c3955ddef875bafd123f85131c10
Bates Number
EFTA01799326
Dataset
DataSet-10
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!