From: Richard Kahn <
Sent: Sunday, May 1, 2016 9:11 AM
To: Jeffrey Epstein
Subject: Fwd: Great St James
Richard Kahn
HBRK Associat=s Inc.
575 Lexington Avenue, 4th Floor
New York NY 100=2
Tel
Fax
Cela
Begin forwarded message:
From: Hugo Hodge
Date: April 30,=2016 at 8:38:50 PM EDT
To: Richard Kahn <
Subject: =e: Great St James
<=iv>
With the greatest respect for you and your client, I'm sorr= but HKT will have to respectfully decline to
accommodate that offer. =/div>
Apparently you have someone off island, unaware of=the local requirements and hopefully the cost you are
expecting to pay will=not increase when they acquire that knowledge.
$50= is more than 50% below the proposal and, for lack of better words, quite u=acceptable and insulting.
Should you run into diff=culties with your other option HKT stands prepared to deliver first class r=sults as
described in our written and verbal communication.
O= Apr 30, 2016, at 4:04 PM, Richard Kahn < >>
wrote:
Thank you.
Richard Kahn
HBRK Associate= Inc.
575 Lexington Avenue, 4th Floor
New York, NY 1002=
EFTA_R1_00137947
EFTA01799326
Tel
Fax
Cell
On Apr 30, 2016, at 10:27 AM, Hugo Hodge
> wr=te:
Good m=rning Mr.Kahn,
I have thoroughly reviewed your sug=estions for modifications to the bid and given your request
great considera=ion. I honestly believe that the items you requested are important for a su=cessful project. For example,
the witnessing of the factory acceptance is n=t a step I would recommend omitting.
With that sa=d, the items you suggested to remove total $23,000. To ensure the integrity=of this
project I am willing to do the project with the entire scope at the=original price less $23,000 for a total of $80,000. If you
decline this opt=on and are convinced that these items should be omitted, I am willing to re=uce the remaining items by
10% resulting in a cost of $72,000 for the revis=d scope.
I strongly recommend you consider the fi=st option but I am willing to discuss this further with
you if necessary.</=iv>
Best Regards,
Hugo Hodge Jr=/div>
On Thu= Apr 28, 2016 at 12:32 PM, Richard Kahn <an; wrote:
it was a pleasure speaking with you earlier. as discussed t=e following areas are scopes
that will not be needed and my comments:
a) conceptual design on cable routes - ok to keep - pl=ase revisit pricing
b) detailed cable specs and preparation o= bid docs - ok to keep - please revisit pricing
c) derailed switch and meter design and prep of all switches and metering device -
=nbsp;ok to keep - please revisit pricing
d) review all swi=ch and cable bid submittals and submit to Wapa for approval - ok
to=keep - please revisit pricing
e) witness factory acceptance t=st - not necessary as all we need is for you to review test
from manufac=urer and should be included in d) above
f) complete final des=gn to include civil and electrical drawings - ok to keep - please
r=visit pricing
g) witness installation and test electrical dev=ces - not needed
h) complete as builts - not neede=
i appreciate your effort in revisiting y=ur pricing and look forward to hearing back from
you this afternoon
thank you
Richard Kahn
2
EFTA_R1_00137948
EFTA01799327
HBRK Associates Inc.
=75 Lexington Avenue 4th Floor
New York, NY 10022
tel
cel
3
EFTA_R1_00137949
EFTA01799328
ℹ️ Document Details
SHA-256
e81675a7900177c8f117ac5dae81db7d1fb6c3955ddef875bafd123f85131c10
Bates Number
EFTA01799326
Dataset
DataSet-10
Document Type
document
Pages
3
Comments 0