EFTA01735281
EFTA01735283 DataSet-10
EFTA01735285

EFTA01735283.pdf

DataSet-10 2 pages 548 words document
P17 P18 V11 V16 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (548 words)
NPremiAir To: Freedom Air International Email Attention: Larry Visoski Fax No: From: PremiAir Commercial Department Fax No: +44 ESTIMATE No. PAE/BB/1O0O1227/TC dated 18-01-2012 Aircraft Registration:N901RL PremiAir Aircraft Engineering Ltd is pleased to provide an estimate as follows:- Work order: TBC Tasks: Description: To Carry out Maintenance required bringing the aircraft up to a flying condition Labour: 321hrs @ £75.00/hr £24,075.00 1. To Perform 50/100/150/300/600 Hour and 12/24 Month insp. 2. To Provide and install x1 Tail Rotor Blade, 3. To Overhaul Autopilot servos, to remove/refit 4. To Refurbish Wheels and Brakes, Repaint silver, 5. To Replace x3 Tyres, 6. To Remove Existing Particle separator and Install IBF System, 7. To Replace Pilots Heated Windscreen, 8. To Carry Out Sample Testing of Engines and Gearbox oils, 9. To Carry out Main Rotor Track and Balance (Inc in item 1.) 10. To Inspect the Main Rotor Hub for Corrosion (Inc in item 1.) 11. To Replace x3 TRDS bearings, 12. To Carry out Main Driveshaft Strip/InspecURebuild and Dynamic balance. Part costs as above 2. To Provide and install x1 Tail Rotor Blade, $34, 643.70'" 3. To Overhaul Autopilot servos, to remove/refit $86,250.00** 4. To Refurbish Wheels and Brakes, Repaint silver, $5,080.70 5. To Replace x3 Tyres, $2,000.00 6. To Remove Existing Particle separator and Install IBF System, $57, ma 00" 7. To Replace Pilots Heated Windscreen, 561,498.55** 8. To Carry Out Sample Testing of Engines and Gearbox oils, £200.00 11. To Replace x3 TRDS bearings, $8,414.55 Total $255,587.50 £24,275.00 Should you have any technical queries please contact Engineering, and for Commercial issues please contact the Commercial Department. Should you wish to roceed lease return a duly signed and dated copy of this estimate by return to fax number: +44 or email: ONLY TERMS & CONDITIONS • Labour charges are not included in this estimate unless • PremiAir Standard Conditions of Trading for the otherwise stated above. sale of goods and services apply • Valid for 30 days, subject to prior sale or withdrawal • Overhaul prices are for Standard Overhaul only • Price quoted exclusive of VAT at current rate • Errors and Omissions Excepted • Price quoted exclusive of freight/import/export & duties • Exchange items subject to supplemen tary billing • Payment Terms: 50% on signing of Estimate, Prior to work commencing, Balance on completion. Note: Items marked with (**) in accordance with PremiAir policy any items over $30,000.00 payment in Advance on signing of estimate, prior to work commencing. PreinpAir Aircraft Engineering Ltd Business Aviation Centre Eilacktnishe Airport Camberley Surrey GU17 9LG United Kingdom Tel: •44- Fax: .44 Einal Web: envy/ premiair-engineering can Registered Address: Sixth Floor, 90 Fetter Lane, London EC4A 1PT. No. 1128286 EFTA_R1_00017386 EFTA01735283 111PremiAir Sign/." 2- H For and on behalf of yr a' 1 2 / --) Date hitt- Sign Ni For and on behalf of Date PremiAir Aircraft Engineering Ltd PremiAir Aircraft Engineering Ltd A signature in this box constitutes acceptance of PremiAir Standard Conditions of Trading for the sale of goods and services. Date Signed for and on behalf of Freedom Air International PRINT NAME: PremiAir Aircraft Engineering Ltd Business Aviation Centre Blackbushe Airport Camberley Surrey GU17 91.6 United Kingdom Tel: 444 Fax: •44 Email: Web: vmufbremiair-engineering.com Registered Address: Sixth Floor. 90 Fetter Lane, London EC4A 1PT. No. 1128286 EFTA_R1_00017367 EFTA01735284
ℹ️ Document Details
SHA-256
e848893a41d695c338a2c05e5864485356479b3f1a1f4f12471c7246037aa499
Bates Number
EFTA01735283
Dataset
DataSet-10
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!