From: jeffrey E. <[email protected]>
Sent: Friday, June 3, 2016 8:35 PM
To: Richard Kahn
Subject: Re: ZDC Microwave Link
oik
On Fri, Jun 3, 2016 at 4:34 PM, Richard Kahn > wrote:
attached is email with proposed worst case date= for Zorro microwave install
future tech was waiting for latest techno=ogy on dragon wave which is causing a potential 2-3 week pushback
from ori=inal planned completion date of July 15th
email below states tha= they would begin testing 8/5/2016 and i would add an extra week for poten=ial
unforeseen issues
i am concerned this will interfere with yo=r planned visit
please advise
thank you
=/div>
FYI - future tech feels confident that they can g= directly from sandia crest to main house
(still need to work ou= issues on pole height and or new pole at main house which future tech wil= install for us)
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
<=iv style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:=px">From: Chris
Capp=ello «mailto:[email protected]»
Subject: RE: ZDC Microwave Link</=>
Date: June 3, 2016 at 9:27:14 AM EDT
To: Richard Kahn
EFTA_R1_01567075
EFTA02461190
Cc:
<zorro.office@gmai .co=>, "Peter
Ca iello& • uo.: unntun
er Tanner
Hello Richard and Brice,
I hope a=l is well.
=C2*
Per our discussion ea=lier this week we follow up with Dragonwave on an exact date of delivery.
=ragonwave has informed us that the radios (Long lead item) would ship by no later than 7/29.
Net of this, we would like to plan for the followin= to help mitigate the timing delay of the radio arrival
and try to keep th= installation timing as tight as possible and stick to the original solution using the E=hanced Multi-
Carrier solution.
Seq=ence of Events:
Pre-ship all materials besides the radios (T= arrive in market the week of 7/25 or earlier)
* Antennas, Mounts, Installation Materials, Ca=le, etc.
• FT build crew to arrive in market on Su=day 7/31/16
• =span style="font-size:11.0ptfont-family:"Calibri",sans-serir=FT will begin the construction on
8/1/16 starting with the Main Residence =ocation
• Onc= the main residence location is complete, we will move to Sandia Crest<=u>
By the time FT is CONSTRUCTION COMPLETE on b=th ends the radios will arrive in
market.
• FT will th=n pre-configure the radios at the main residence location and then
install=them on each end
• Once the radios are installed, FT will =egin the link alignment. (We would expect to be at this
point by Friday 8/5/16
• In the case the Sandia Crest to Main Residen=e location does not meet the performance
requirements, we will then go build the ZDC tower and relay the connection through there=u>
2
EFTA_R1_01567076
EFTA02461191
Please review and let us know if we can move forward on =his basis.
=C240
We need your confirma=ion, so that we can finalize the FCC licensing to be the enhanced multi-ca=rier
product. Our preference would be to maintain this plan, but will defer to you for guidance.
NOTE: We are of course trying to see if we c=n make any improvements on the timelines, but this would
be what we feel i= conservative planning, based on the information we have.
Thanks again!
=span>
Best regards,</=>
Chris Cappiello
<= class="MsoNormal">Director of Busin=ss Development
Future Technologies Venture LLC
From: Richard Kahn [mailto
Sent: Wednesday, June 1, 2016 10:38 AM
To: Chris Cappiello
Cc: Brice Gordon
3
EFTA_R1_01567077
EFTA02461192
Subject: Re: ZDC Microwave Link
thanks
Richard Kahn
HBRK Associates Inc.
at 10:32 AM, Chris Cappiello
> wrote:
Richard,
Do you have a preference?
<1=>
Best rega=ds,
Chris Cappiello
Director of Business Developme=t
Future Technologies Venture, LLC
4
EFTA_R1_01567078
EFTA02461193
From: Brice Gordon [mailto:[email protected] <mailto:zdc.rt41@g=ail.com>
Sent: Wednesday, June 1, 2016 10:31 AM
To: Chris Cappiello
Cc: Richard Kahn < ' Ct
<[email protected] <mailto:[email protected]»
Subject: Re: ZDC Microwave Link
, either time works for me
016 at 7:33 AM, Chris Cappiello
wrote:
Hey Brice and Richard,
Do you have time today at 4 or 5 EST to catch up on this project?
Best regards,
Chris Cappiello
Director of Business Development
Original Message
• From: Brice Gordon [mailto
Sent: Wednesday, May 25, 2016 5:31 PM
piello
Cc: Richard Kahn •
ZDC <[email protected] <mailto:zor=o.offic
Subject: Re: ZDC Microwave Link
Thank you
5
EFTA_R1_01567079
EFTA02461194
Sent from my iPhone
> On May 25, 2016, at 3:19 PM, Chris Cappiello
wrote:
> the FCC licensing process is in process and we are waiting for a confi=mation. We
expect it by NLT Wednesday
> Once that is complete we will verify the equipment availability
> Best regards,
> Chris Cappiello
> Director of Business Development
11111111
> Original Message
> From: Brice Gordon imailto:[email protected] <mailto:[email protected]> I
> Sent: Wednesday, May 25, 2016 4:34 PM
> To: Chris Cappiello <
Brice Gordon
Stanley, NM
=C2* please note
The information contained in this communication =s
confidential, may be attorney-client privileged, may
6
EFTA_R1_01567080
EFTA02461195
constitute in=ide information, and is intended only for
the use of the addressee. It =s the property of
TEE
Unauthorized use, disclosure or copying of thi=
communication or any part thereof is strictly prohibited
and may be=unlawful. If you have received this
communication in error, please noti=y us immediately by
return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and
des=roy this communication and all copies thereof,
including all attachment=. copyright -all rights reserved
7
EFTA_R1_01567081
EFTA02461196
ℹ️ Document Details
SHA-256
e85abc47a9032e8f3b88b5b63098ae751544e57782aa62b932bb54106560ba2b
Bates Number
EFTA02461190
Dataset
DataSet-11
Type
document
Pages
7
💬 Comments 0