EFTA02356150.pdf

DataSet-11 1 page 225 words document
👁 1 💬 0
📄 Extracted Text (225 words)
From: Richard Bamett Sent: Sunday, June 19, 2011 3:55 PM To: jeffrey Epstein; rich kahn Subject: RE: Good morning Mr. Epstein the net work cable was completed by sawyers to all=SCU controller locations on 5-12-11. The contract with siemens was signed =y Rich Kahn on 5-31-11. The contract reads under project schedule engineer=ng submittals material ordering, equipment delivery ,installation,st=rt up & commissioning will take two months from contract date for co=pletion which is 7-31-11. Equipment is on order and will be delivered to 7= st street,the project engineer was at 71st on friday 6-17-11 to make a =ack up of the scu controller information . He told me he wou=d contact me when controllers are ready to ship to 9 east 71st.Richard Bar=ett. Date: Sun, 19 Jun 201107:44:05 -0400 Subject: Fro • • = • To: si=mans ? house uprgrade ? where are we? The information contained in this communication is confidential, may=be attorney-client privileged, may constitute inside information, a=d is intended only for the use of the addressee. It is the property of<=R>Jeffrey Epstein Unauthorized use, disclosure or copying of this and may be unl=wful. If you have received this communication in error, please notify=us immediately by return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and destroy this communic=tion and all copies thereof, including all attachments. copyright -al= rights reserved 1 EFTA_R1_01340157 EFTA02356150
ℹ️ Document Details
SHA-256
e958b3a61061bee549217c324b455f7f97cb8f5018da3860134427cf1032a305
Bates Number
EFTA02356150
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!