📄 Extracted Text (217 words)
Proposal
DATE I 7/23,2O1O
TERMS AND CONDITIONS
S 0 t_J INA 0 .›C (0))) 1) 50% DEPOSIT UPON SIGNING
The ultimate in home and Mobile Entertainment
360 WEST NORTHW EST HIGHWAY 2)40% PAYMENT UPON DELIVERY
BARRINGTON. ILLINOIS 60010 OF ALL EQUIPMENT TO JOB SITE.
OFFICE
FAX 3) 10% PAYMENT UPON 100%
COMPLETION OF THE JOB
NAME Jeffery Epstein 4) LABOR WILL BE BILLED WEEKLY
Address 71st Street 6th floor AT TIME AND MATERIAL
City/St
Phone # 5) SEE ATTACHED TERMS AND
EMAIL CONDITIONS FOR FURTHER INFO.
QTYI PRI BRAND I PART # I DESCRIPTION PRICE I TOTAL
JBL Synthesis
2 ea JBL Synthesis 1400 Array BG 3 Way Tower $5,200.00 $10,400.00
1 ea JBL Synthesis 880 Array BG Center $3,550.00
2 ea JBL Synthesis S2S Subwooter $2.750.00 $5,500.00
1 ea JBL Synthesis S820 Sub Amplifier $3,500.00
Total $22.950.00
PMC / Audio Control
1 pr PMC PB1i Tower Speakers $12.500.00
1 ea PMC CB6i Center Speaker $4,250.00
2 ea JL Audio F112 Subwooter $2,850.00 $5,700.00
1 ea Audio Control Maestro M3 Preamp Processor $5,900.00
1 ea Audio Control Pantages 5 Channel Amp $2.500.00
Total $30,850.00
Screen Innovations
1 ea SI Screen 130" Diagonal Motorized Screen $4,200.00
Pro ector
1 ea Digital Projection D Vision Dual Lamp 1080p $29,500.00
PAGE 1
If approved please fax back each page:
EFTA00727398
ℹ️ Document Details
SHA-256
e9e0c070340890d3b70271306630cb50c519eb214709443e9354264013f9db8a
Bates Number
EFTA00727398
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0