JE - LSJ and GSJ - W/E July 14, 2017 p smartsheet
Dural'
Task Name and Scope Assigned To Start Finish Status Comments
on
1 Cabana 2 New a/c unit install Michael 1d 07/21/17 07/21/17
2 Virgin Mary Je lOAdvise
3 MR paint trim tabs Carlos 1d 07/21/17 07/21/17 complete
4 Christmas cove shelf make level Peter 07/18/17
Jim Cross landscaping Report done by 7-24- 9d 07112/17 07/24/17
5 17
12 volt Fan order for pebble beach shipped Kimberly
6 and due to arrive in Palm Beach Between
August 9th and the 20th
7 Back fill hole next to fuel tank room Jules 1d 07121117 07/21/17 Comp to
Fix Air pump compressors outside pump Michael 07/21/17
8
room in staff kitchen
9 Fix dogged drain inside pump roomLSJ Danny / smile 07119/17 In Progress
10 Cover all electrical panels, and outlets. Danny V 5d 07/24/17 07/28/17
Fuel Tank room needs serviced -- Tank 2 Danny V Awaiting Report & Bid. Anna to Mow up
with Nester on 7121
11 FOS valve Failure and Replace polish filters.
Ann Called Nester. awaiting Bid 8 report
12 Hang swing at pergola sylvester 33d 06/15/17 07/31/17
13 Relocate dryer vent at Gsj Danny E 1d 07/21/17 07/21/17 Complete
14 set up scaffolding and 4 flood lights on palm danny V 07/20/17 Jee to approve
15 Fix pavors on pops terrice Dupson
16 Fix tile on pops terrice Svester
Rebuild back step and A/C screens at Sylvester 6d 07/31/17 08/07/17
17 cottage house Lsj
Build roof and doom at the info center Sylvester 4d 08/01/17 08/04/17
18
electrical area
19 library fix buzzing lights inside. Danny V 06/28/17 Je needs to approve
20 . Replace out door recessed lights library Danny V 1d 07/21/17 07/21/17 Complete
Run electrical wire to sconces on stone Danny V 1d 07/24/17 07/24/17
21 pillars Master dr. entrance of compound.
221 LSJ Under water lights need to be fixed Danny V 6d 07/11/17 07/18/17 PROJECT COMPLETED
Waterfall: Danny to fix waterfall Shut off Danny V 1d 07/21/17 07/21/17 complete
23
switch
Blue Beach: Extend steps down on Blue Sylvester Sd 08/14/17 08/18/17
24
Beach.
LSJ Repaint Sundial and all benches around TJ 07/21/17
25 it.
Exported on July 21.2017 5:51:20 PM PDT Page 1 of 5
EFTA00804049
Durati
Task Name and Scope Assigned To Start Finish Status Comments
on
LSJ Helipad: wall papering ordered on the 7- Kimberly Ross
11-17 & delivery estimate 7-24-17 Rug
26 ordered waiting for aMval. Furniture ordered-
Bench back ordered Estimated delivery to
Tropical Shipping August 31st.
LSJ Entrance basket: Dupson to create stone Dupson 05/31117 In 'Negress
27 wall around basket 5/31. Je to approve down
lighting
LSJ Staff cottage countertops: Caribe Craft George 05/19/17 counter tops will be (tethered and
Custom Milkvork will fabricate and install the installed 7.22.17
(56) ft of 3CM color Gray Speckle granite
28 countertops. Bid for $8400 approved 5119.
delivered during this week and installed 7-
22-17
29 LSJ Staff cottage punchlist: Cooktop install, Danny V ld 07/24/17 07/24/17
Kitchen sink and waste disposal, dishwasher
Lsj Staff cottage Sylvester to complete Syvester 1d 07/21/17 07/21/17
30 Gutters
LSJ Staff cottage painting: TJ -needs to finish TJ & Oriole 36d 06/02/17 07/21/17 Complete
31 out side area.
LSJ Staff Cottage furniture: JE approved the Kimberly 37d 06/29/17 08/18/17
518,697 quote from Silk Greenery for Living.
Dining and MBR furniture. The 60% deposit
32 (514,764) made 716. Silk Greenery will
deliver the in-stock furniture 7-17 -17. The
balance of the furniture EDA by 8-?-17.
33 Cabana 2: rotten back door needs replaced Sylvester 6d 08/07/17 08/14/17
LSJ Lane Venture furniture: Replace the Kimberly 32d 06/16/17 07/31/17 In Progress
furniture outside of the Library, MBR. and
34 sofa in the Flagpole Pool. Order placed 6/16.
AMved to Tropical FL 7/19. Scheduled to sail
7/21. EDA on STT 7/25.
Tiki Hut Roof: Replace the palm thatch. JE Sylvester 6d 08107/17 08/14/17
35 to advise start date for project.
36 Picnic tables for GSJ Sylvester 2d 07/19/17 07/20/17 PROJECT COMPLETED
GSJ Solar Shed: Budd double doors In Solar Sylvester 05/25/17
37 shed.
GSJ Solar Shed: Install insulation in Solar Danny V. 05/02/17
38 shed. Installation spray in GSJ shed. Discuss
with Jee
39 GSJ Solar Shed: Install lighting in Solar shed. Danny V. 05/10/17
to be done after foam installation
GSJ Solar Shed: Install A/C in Solar shed. Reefco 06/14/17 Jee- Discuss why we need arc In shed?
40 Reefco submitted bid of S12K to install (2) 3
ton Fujitsu NC units in Solar shed. under
review with Rich for payment.
Nanna boat cushion covers - JE requested Carlos 33d 06128/17 08/11/17 In Progress
(2) new sets. Custom Canvas quote of
41 $5,770 approved. Deposit made 6/28. Fabric
in stock by 7/14. EDA to completion 8/11.
Exported on July 21, 2017 5:5120 PM PDT Page 2 of 5
EFTA00804050
Dural"
Task Name and Scope Assigned To Start Finish Status Comments
on
Tunnel Woodshop - Sylvester and a helper Sylvester 69d 05/02/17 08/04/17
42 need to completely empty out and
reorganize.
43 Outdoor furniture Alibaba Kimberly Ross 06/24/17
44 GSJ Finish and clean Employees Danny V 6d 07/17/17 07/24/17
bathrooms
45 GSJ Staff Cottage: Renovation Sylvester 35cl 06/27/17 08114/17 In Prowess
LSJ Flve Palms: Construct wall around 5 Dupson JE TO ADVISE.
Palms. JE to advise & Dalce
LSJ Five Palms: Create coping for Five Dupson JE TO ADVISE.
L Palms in house. JE to advise on design & Dalce
Ann Rodriquez 07/06/17 After we receive Boscoe list of
a8 Barge Painting and Capt. Bosco needs to items we will coordinate a date to
have everything done to the
give update on barge maintenance. Barge all at the same time.
(Maintenance, Repairs & Paint)
a9 INFO center hide wire hanging down from Danny E 07/21/17 07/21/17 Complete
ceiling
Grey Jet Ski 2: Replace staler and Fuel Tap 07121/17 07/24/17
50 Pump. Parts arriving at the Palm Beach
house 7/13
51 Change 2 bike batteries Tap 2d 07121117 07/24/17
52 ONGOING MAINTENANCE
53 TSG Monthly service plan for R/0 plant LSJ Michael need to tak WA1Rich about the arks.
54 Reefco monthly service for a/c units Michael
55 Ocean Pest Control Michael bi weekly
LSJ Spraying for white flies on Chris CONDUCTED EVERY FRIDAY
56 bougainvilleas.
GSJ Spraying for white flies on Chris CONDUCTED EVERY FRIDAY
57 bougainvilleas.
Ocean Pest mosquito spraying. Main Michael they swayed morning or 7-t647
58 compound, Tiki. Flag pole pool, info center &
Five Palms --.Sprayed with Suspend
Polyone.
59 LSJ Irrigation - check for leaking. Cristobal 3d 07105117 07/07/17 PROJECT COMPLETED
GSJ Solar Battery Monthly Maintenance ProSolar
60 program. approved by RK 3/11, started with
ProSolar.
61 BIDS AND PERMITS
GSJ Service Road project On hold. Awaiting PERMIT CM HOLD AWAI11NG PERMIT
62 permit.
Exported on July 21, 2017 5:5120 PM PDT Page 3 of 5
EFTA00804051
Dural"
Task Name and Scope Assigned To Start Finish Status Comments
on
John Woods Is preparing the GSJ Minor John Woods 70d 07/05/17 10/10/17
Permit application for A Remainder projects
(80-foot flagpole. 3 Quonset huts. swimming
63 pool. Residential cottage with gym and spa
buildings). JE approved to print the Revised
13-Page Plan Drawings for A Remainder
Permit 7/13. JE will walk in the Permit
Applications.
John Woods is preparing the GSJ Minor John Woods 70d 07/05/17 10/10/17
Permit application for C-1 Remainder
projects (80-foot flagpole, Residential
cottage. Tennis and adjacent storage
building). JE approved to print the 11-Page
Plan Drawings for C-1 Remainder Permit
7/12. JE will walk in the Permit Applications.
GSJ Cistem request for the issuance of a PERMIT Cal HOLD AWAITING INSTRUCTION TO
'Certificate of INC filed with CZM 4/25. PROCEED
65 Awaiting Approval to schedule Paul Kalloo for
an inspection.
Amy Dempsey spoke wkh Amy Dempsey wed. 7-S-17
GSJ Dock awaiting revised drawings & letter She said cable rim permit between islands
66 from ACOE. JE and Rich spoke with Amy 0 months out and dock permits a months
Dempsey regarding status. out. All going threw review by Army caps.
Michael
67 PURCHASE UST
68 Purchase new water maker for GSJ. Michael & Rich
St. John Awning proposal forwarded to JE & call brice Brice said not order
69 RK 12/18/16.
Cabrita Point Fiber cabinet solar backup: for Jermaine Ruan 07/11/17 spoke with Jermaine 7.21.17 He is going
consideration once Pebble Beach project to order equipment today. once the
equipmeM is in Danny V. will mount on
completed. ProSolar will review and provide Pole.
bid when Brad back on island week of SM.
70 518 Brad recommends GOAL ZERO YETI
1250 PORTABLE POWER STATION KIT
$2,467.94 (including shipping and handling).
Brad estimate is $150 for the 1st hour S75
every additional hour. Waiting for approval to
proceed.
GSJ 2007 Lull needs a transmission. Lucas Richard
forwarded all info on transmission to Anna &
71 Rich. Rich to advise. Sheridon asked that we
purchase a new Lull and use the damaged
lull for parts for the old lull.
JE approved to buy a new Lull 2 to 3 years Michael, Tap. Rich 06126117 Will talk to Rich 7.21.17 to check cc
72 progress
old.
73 Chillax Office Wall construction Estimate Jimmy Freguela SW vial
from BWC forwarded to JE & Rich 4/20.
74 R/O Metal shed - Prelimary bid from BWC Jimmy Freguela SW vial
forwarded to JE & Rich 4/20.
75 Research Wind screens for main pool. Michael
GSJ Helipad Construction awaiting permit
BWC standing by to produce the bid to
76 construct The lights are onsite and in
storage.
Exported on July 21, 2017 5:5120 PM PDT Page 4 of 5
EFTA00804052
Task Name and Scope Assigned To Dural" Start Finish Status Comments
on
rr Researching new staff transporting boat. Carlos 15d 06105/17 06/23/17 poi on hal for now
Exported on July 21, 2017 5:5120 PM PDT Page 5 of 5
EFTA00804053
ℹ️ Document Details
SHA-256
eb86f23b5cf44d9944c145bbc71c3a3aa885c9b6a46f4728fa8f9ffa26d9f2b3
Bates Number
EFTA00804049
Dataset
DataSet-9
Document Type
document
Pages
5
Comments 0