EFTA00662520.pdf
👁 1
💬 0
📄 Extracted Text (206 words)
From: Leighton Allenby
To: Jeffrey Epstein <[email protected]>
Cc: NYC - Richard Kahn , Leighton Allenby
Subject: Neptune LLC Construction Costs
Date: Mon, 24 Aug 2015 12:23:11 +0000
Attachments: Neptune_LLC_2015_Construction_Projects_8_24_15.xlsx
Hello Mr. Epstein,
Below is a line item for the following work at your Palm Beach Property that is attached as an Excel spread
sheet
with tabs at the bottom to view each project individually if needed.
The first tab, Neptune LLC Construction Master, will give you all the information needed for the projects (costs,
description of services, lead time to start, days to complete, etc).
If needed I can send you the backup documentation from Dan as a pdf.
I. Awning motor repair
2. AIG Wind Mitigation - two options
3. Window (14) replacement at main house
4. Painting of main, pool and staff house
5. Terrace Restoration
6. Seawall repair
7. Option: New dock with boat lift
8. Draft timeline - draft/will update as projects are approved
Please let me know which items to proceed with. If you have any questions please do not hesitate to email or
call.
Dans cell number is on the spread sheet if you would like to talk to him directly.
Best,
Leighton
Leighton Allenby
Director of Properties
SS=
EFTA00662520
ℹ️ Document Details
SHA-256
ebe9c21e1ce79e5f73bfcbc16057f7350ced099d5d7880e8ef4ab39b7f3e1246
Bates Number
EFTA00662520
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0