EFTA00696757.pdf
👁 1
💬 0
📄 Extracted Text (184 words)
From: "Emad Hanna"
To: "Jeffrey Epstein" <[email protected]>
Subject: Budget Overages
Date: Mon, 10 Jan 2011 20:03:49 +0000
Attachments: SICMBT_C25311011015450.pdf
Jeffrey,
A lot of the overages have been covered by adjustments made throughout the life of these projects.
If you look at the 15t page of the attached you will see an example of line items being reduced and other increased.
The second page is the adjustment they want to do that I sent you a few days ago and if you look at the back up I attached
for project # 1002 you will see once we put that into the system it will wipe out the current overage.
I probably have about 30 of those reclassification sheets in total for all the projects and if you really wanted to get a true
picture of the line item overages I would have to go back and reverse all of these entries and than you would really get an
accurate picture.
Thank you
Emad Hanna
Project Controller
HBRK Associates
301 East 66th St
Suite 10F
New
Cell
IS) Office
St. Thomas
NY Office
Fax
EFTA00696757
ℹ️ Document Details
SHA-256
ed32aea65f92f68a0ad20ee94e5c6291ab71ef7425fee16da8f3cfbec098d1db
Bates Number
EFTA00696757
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0