EFTA02456062.pdf
👁 1
💬 0
📄 Extracted Text (162 words)
From: Larry Visoski
Sent: Wednesday, July 20, 2016 3:46 PM
To: Je vacation; Rich Kahn
Subject: Nautica update
Attachments: IMG_6331.1PG; Untitled attachment 00136.txt; IMG_6332JPG; Untitled attachment
00139.txt; IMG_6333JPG; Untitled attachment 00142.txt; IMG_6330.1PG; Untitled
attachment 00145.txt; IMG_6329JPG; Untitled attachment 00148.txt
Update:
Side panel 90degree floor bracket to be epoxy this week, decor side panel in=tall by Friday, Zed does not need Boat to
fabricate rear bench seat, he will take measuremen=s and build a removable rear bench seat, for ease of access to oil
filter a=d lower Bilge pump maintenace.
I feel confident I should have boat in paint shop by Aug 1st„ -Aug 1st Boat in Paint shop -three weeks in Paint shop -out
of paint shop August 21st -Silvio installs new tubes 1week, Ready to ship to LSJ by Sept 1st. ?
(Every estimate I've been given except Silvio out Tube guy, has been wrong). I hope I can deliver Boat to Tropical to
Ship by Sept 1.
1
EFTA_R1_01559079
EFTA02456062
ℹ️ Document Details
SHA-256
ed75a7f84a136fa9bb49b4f7fa8b3c9b9dfa1ba71e34aac5aadf88dccd1c395d
Bates Number
EFTA02456062
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0