👁 1
💬 0
📄 Extracted Text (147 words)
From: Eric Roth <
To: 'Jeffrey Epstein' <[email protected]>
Cc: 'Ivjet'
Subject: Ledge Detail
Date: Mon, 02 Sep 2013 13:10:30 +0000
Attachments: Ledge_Bezel_Detail.pdf; Pieture_010.jpg
Inline-Images: irnage007.jpg; irnage008.jpg; image009.jpg
Jeffrey,
If you are opposed to the switches and cup holders favoring the inboard side, then I propose that we fabricate a bezel plate
that would incorporate the switches and the cup holders. After fitting, we will have the bezel metal plated to match the
switches.
Attached is a bezel that we had made for the global express arm rest where we incorporated the cup holder and N arm
receptacle into one clean look.
Also attached is a 2 page pdf illustrating the proposed bezel detail for the ledges.
ERIC H. ROTH I PRESIDENT
international jet
I N T E R I OR S
#
u1.0
I www.intget.com
2221 Smithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779
EFTA01142167
ℹ️ Document Details
SHA-256
ee27e21a3d7abbe3b36f044973dfc71961673c91ebf54048eafe8124c4fde0f8
Bates Number
EFTA01142167
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0