📄 Extracted Text (462 words)
From: Lvjet
To: [email protected]
Subject: Fwd: JEGE 908JE
Date: Wed, 19 Feb 2014 19:59:03 +0000
Attachments: JEGE C check 2-I9-14.xls
Jeffrey,.
this is the quote I fwd to Rich to review,. I wanted to share with you also,.
this does not include cost for #1 and #3 engine inspection,. that estimate will follow later this week for Miami Gas Turbines,.
Gary is working a buyer with AS IS quote before we start inspection,. long shot, but its possible,. should hear back by end of
week,.
thx
larry
----Original Message
From: Scott Stambaugh
To: jetcare
Cc: 'Lvjet' 'JR Stambaugh'
Sent: Wed, Feb 19, 2014 10:23 am
Subject: RE: JEGE 908JE
Attached is the pricing for the c check and all ADs. I will put together the pricing for the additional items Glenn
sent and forward that on.
Below is the pricing for the SB kit for compliance with AD 2009-05-03 (SB 727-28A-0128 fuel boost pump GFI
relays). These materials for the GFI kit are not in the C check number in the bid. We have completed about 13
of these modifications already and have the long lead time parts in stock. So we won't have any lead time
issues.
Part Number Description Cost per QTY Total
65C38468-15 TOP KIT $25,900.00 1 $25,900.00
KDAG-X4F-001 GFI RELAYS $2,880.00 8 $23,040.00
SUPP.HARDWARE
61-12905-51 KIT $225.00 1 $ 225.00
BACC45FN24-
43P6 CONNECTOR $69.00 3 $207.00
BACC45FN24-
43P9 CONNECTOR $72.03 3 $216.09
BACC45FN24-
43P10 CONNECTOR $72.03 3 $216.09
From: jetcare@aa [mailto:jetcare O aol.corni
Sent: Monda Februa 17 2014 10:22AM
To
Subject: Fwd: JEGE 908JE
Scott,
Please see Glen's additional items to get 908JE through to it's next "C" check after this one.
Larry
EFTA01187342
----Original Message—
From: Glen Webb
To: jetcare
Sent: Thu, Feb 13, 2014 1:03 pm
Subject: RE: JEGE 908JE
Hi Larry,
I've attached a report listing those items that will not make it to the next check in Feb 2016. These are items that can be
done during the 2A next year or done at Stambaugh as an AWR. Everything else is in the package I already put together.
Glen
From:
Sent: ursday, February 13, 2014 10:14 AM
To:
Subject EGE 90JE
Hi Glen,
Can you please build me an updated maintenance package for 908JE. Lets look at cleaning it up for24 months if we don't
get into anything additional major. We are going to do the no.1 and 3 engines at this time as well.
Mike Miejer will be contact you for engine information on the 1&3 . It is OK to forward whatever he requests. Looks like the
Boss is willing to dump some money back into the Ole girl.
Call me with any questions or to discuss the package. The aircraft will be going to Stambaugh within the next week.
Larry
EFTA01187343
ℹ️ Document Details
SHA-256
ee5400eb51f12c6d586d06c648ab9e1a465df1464a49fe0e491f329a21bd1877
Bates Number
EFTA01187342
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0