This is the manufactures recommended procedure for resurfacing of a diamond brite pool
Tom recommends that we follow this procedure
We have have recourse of they screw it up again
Sent from my iPhone
On Jan 31, 2012, at 9:57 AM, Jeffrey Epstein [email protected]> wrote:
we specifillcaly said that the plaster was not to be resurfaced but replayed„ both
gary rex and i agreed. i m not sure why you are sending me this,
On Tue, Jan 31, 2012 at 8:50 AM, brice gordon wrote:
please note attached, paragraphs 2a and 2b from install info for diamond brite
pools resurfacing projects, also spec sheets from Southern Grouts and motars, inc
httpfisgm,cc/pdf/InfoSheets/Diamond Brite web.pdf
the preparation of the main house pool will require that the diamond brite be totally
removed so the 1 x 1 tile can be adhered properly
Flag pool, heater relocation this week, Material is due to arrive STT, tomorrow, Saturday
for resurfacing. refill saturday and sunday
Main pool, heater done and running, materials ordered, expect everything to be on sight
by the 20th Feb, empty the night of the 12th FEB to commence roughing out, 3
to 4 weeks for completion.
EFTA_R1_00486405
EFTA01992962
ℹ️ Document Details
SHA-256
efc8ecf76ed9411df829ebb69da03c33b711a9eb765f153002a8f2a8803cffa2
Bates Number
EFTA01992962
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0