From: 1 <[email protected]>
Sent: Friday, December 28, 2018 7:13 PM
To: michael glidden; Richard Kahn
Subject: Re: On going work list
I thought air con chillax was to be finished last week. =AO 2 do the genarators now work, you were going to get the
fue= parts 2 weeks ago.
On Fri, Dec 28, 2018 at 11:17 AM michael glidde
Good day, I apologize for the delay.
1. =C2 Palm tree lighting. On going.
2. Courtyard lighting. On going
3. Landscape lighting at Master bedroom=stairs. Completed
4. =C2 Pool cabana kitchen electric. On going
5. Main compound cabanas, electric =nd lighting. Completed
A/c on going, chandelier and new lighting comple=ed
7. Dock electric, lighting, under water lighting =nd wifi. On going
8. Ca=era at staff cottage for dock. Pending<=span>
9. Cistern drains for main compound. Pending
10. WAPA switch replacem=nt. Completed
11. Ins=all ducbank/trench from generator bldg to tunnel for future electric feed =o G51 & fiber run for desal
controls. On=going
12. Install movie room ceiling speakers and amps. Temp completed. Awaiting permanent speakers
13. Replace all recessed lights at pool gazebo structures completed
14. Repair 2nd pool heater at fl=g pole pool new unit just arrived, pending<=r>15. Repair/refurbish both fuel
dispensers p=nding
16. Complete trouble shooting/repair Diesal pump feeding d=spenser on going
17. Install new wa=er distribution pump system for LSJ. Al= equipment now on island, pending
18. Refurbish water dis=ribution manifold pending
19. Inst=ll new sewage lift/mascerating pump for L51 staff cottage and piping to tr=atment plant. Pump on
island, pendingq=pan>
20. Address water heating issue at staff cottage pending
21. al tiki kitchen remodel electric=and plumbing ongoing
22. Blue Beac= cottage transformer replacement next job for dock=electrician, pending
23. Electric and data to S palms. Material out to bid, Charles Electric to look at job af=er 1-2-19
24. Electrical conduit work at tower antenna. Pending
25. Solar system and el=ctrical at Pebble Beach cottage. New roof com=lete, needs to be painted/sealed,
pending
26. Power to beach for=captains. Pending
27. =arger filter for sea water intake at library/beach well. Pending
28. Refurbish fire suppression =ystem in generator building. Pending
29. Fuel truck rehab per survey. Truck to be replaced, two quotes forthcoming
30. Generator fuel system refurbishment. Pending
31. Replacement of electric panels in both pool=pump rooms. Pending
EFTA_R1_01801807
EFTA02608743
32= Electric out to new waterfall area. Pe-ding.
33. Replace all exterior light trims to whit= due to rust on going
34. Replace all ex=erior switch and outlet covers due to corrosion. On going
35. Staff cottage dryer to be changed t= propane jetting. Pending=br>36. Install lighting for library statues.
=span>Pending
37. Install new awnings at both pool gazebo =tructures. Awaiting awnings, pending38. Install two new sewage
treatment plants on GSJ. On going
39. Wire new generators on GSJ. On going
40. Install new flagpole lights on GSJ. =A0Completed
41. Replace wat=r distribution pump on GSJ. Completed=C2
42. Install electric and plumbing in new tiki hut o= GSJ. On going
43. Bat=eries to be replaced in GSJ solar system. Pending
44. Daily managing of barge schedule. On going
45. Research and order maintenance/r=pair parts. On going
46. Daily main=enance of electrical and plumbing systems for both islands. On going
47. On going installation an= refurbishment of landscape lighting island wide. On going
48. Coordinate barge maintenance/refurbishment work= Pending
49. Coordinat= with local architects for future services. O= going search for one
50. Daily issues that cannot be anticipate= or avoided. On going
On Dec 21, 2018, at 6:16 PM, Richard Kahn
wrote:
Mike
Can you please update your punch =ist with the following descriptions:
a) completed
b) scheduled
c)=open
Additionally have you completed Spec List to give out to Elect=icians..
Did Charles Electric come out this week? If not plea=e schedule them to review appropriate work next week..
I sent Kyle =heir contact info earlier this week..
In case you never received:
Thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floo=
New York, NY 10022
2
EFTA_R1_01801808
EFTA02608744
On Dec 1, 20=8, at 10:18 AM, Michael Glidden <[email protected] <mailto:mjg.lsj@gmailcom»
wrote:
1. Pal= tree lighting
2. Courtyard lighting
3. Land=cape lighting at Master bedroom stairs
4. Pool cabana kitch=n electric
5. Main compound cabanas, electric and lighting<=r>6. Chillax a/c renovation, chandelier removal and
lighting7. Dock electric, lighting, under water lighting and wifi
=. Camera at staff cottage for dock
9. Cistern d=ains for main compound
10. WAPA switch replacement
11. Install ducba=k/trench from generator bldg to tunnel for future electric feed to GSJ &am=; fiber run
for desal controls
12. Install movie room ceiling speakers =nd amps
13. Replace all recessed lights at pool gazebo structures
1=. Repair 2nd pool heater at flag pole pool
15. Repair/refurbish both fu=l dispensers
16. Complete trouble shooting/repair Diesal pump feeding =ispenser
17. Install new water distribution pump system for L51
18.=Refurbish water distribution manifold
19. Install new sewage lift/masce=ating pump for LSJ staff cottage and piping to treatment plant
20. Addr=ss water heating issue at staff cottage
21. LSJ tiki kitchen remodel el=ctric and plumbing
22. Blue Beach cottage transformer replacement
23= Electric and data to S palms
24. Electrical conduit work at tower ante=na
25. Solar system and electrical at Pebble Beach cottage
26. Power=to beach for captains
27. Larger filter for sea water intake at library=beach well
28. Refurbish fire suppression system in generator building<=r>29. Fuel truck rehab per survey
30. Generator fuel system refurbishme=t
31. Replacement of electric panels in both pool pump rooms
32. Ele=tric out to new waterfall area
33. Replace all exterior light trims to =hite due to rust
34. Replace all exterior switch and outlet covers due =o corrosion
35. Staff cottage dryer to be changed to propane jetting
37. Install new awnings at bot= pool gazebo structures
38. Install two new sewage treatment plants on =S1
39. Wire new generators on GS1
40. Install new flagpole lights on=GS1
41. Replace water distribution pump on G51
42. Install electric =nd plumbing in new tiki hut on GSJ
43. Batteries to be replaced in GSJ =olar system
44. Daily managing of barge schedule
45. Research and or=er maintenance/repair parts
3
EFTA_R1_01801809
EFTA02608745
46. Daily maintenance of electrical and plu=bing systems for both islands
47. On going installation and refurbishme=t of landscape lighting island wide
48. Coordinate barge maintenance/rerurbishment work
49. Coordinate with local architects for future service=
50. Daily issues that cannot be anticipated or avoided
That wou=d be all for now.
=AO please note
The information contained in this commu=ication is confidential, may be attorney-client privileged, may cons=itute
inside information, and is intended only for the use of the addre=see. It is the property of JEE Unauthorized use,
disclosure or copyi=g of this communication or any part thereof is strictly prohibited a=d may be unlawful. If you have
received this communication in error, pl=ase notify us immediately by return e-mail or by e-mail to
[email protected], a=d destroy this communication and all copies thereof, including all a=tachments. copyright -all
rights reserved
--000000000000f84074057e19d9cf-- conversation-id 315754 date-last-viewed 0 date-received 1546024379 flags
8590195713 remote-id 886000
4
EFTA_R1_01801810
EFTA02608746
ℹ️ Document Details
SHA-256
f0006abb0682cc374167c0d72057a280a87f50d170498278dea219793cdc0bc3
Bates Number
EFTA02608743
Dataset
DataSet-11
Document Type
document
Pages
4
Comments 0