📄 Extracted Text (181 words)
From: Larry Visoski
Sent: Thursday, July 5, 2018 5:15 PM
To: Je vacation
Cc: Rich Kahn
Subject: Heli update
Jeffrey
Installing the blades now, bleeding the brakes, I should be doing engine leak check ground runs and tail rotor drive shaft
b=lance by 4pm today„ If your schedule permits, we would do main rotor blade tracking all day tomo=row, I'll update
you at 5pm today,
GIV update
Westfield accomplished engine runs earlier this week, GIV will be ready for t=st flight mid next week, OR we delay the
test flight until after dual loane= engine install scheduled for July 15,
G550
Pete is finishing up G550 sink drain bushing install, and HEX drain valve ha=dle (like you wanted instead of the Round
hard to grip handle Eric installe=).
***installed 2 / 24" demo LED light bulbs in upwash for your viewing=when we depart PBI-STT.
Thx,
Larry
Sent from my iPhone=<?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN"
"http://www.apple.com/DTDs/PropertyList-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-id</key>
<integer>391</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1530810903</integer>
<key>flags</key>
<integer>8590195717</integer>
<key>gmail-label-ids</key>
<array>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>833770</string>
</dict>
</plist>
1
EFTA_R1_01765906
EFTA02586016
ℹ️ Document Details
SHA-256
f09fd79c417c4ab6303a5c71aaff329c8c3fe2a91f541d14a0cec49e002edfb8
Bates Number
EFTA02586016
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0