EFTA00574720.pdf

DataSet-9 4 pages 539 words document
👁 1 💬 0
📄 Extracted Text (539 words)
From: Gregory Riches < To: A Barrett a Cc: ICatyna Shuliak < >, [=. Subject: Re: 301 E 66 10B Date: Fri, 24 Oct 2014 15:52:00 +0000 How about 2? G On Oct 24, 2014, at 11:47 AM, A Barrett a wrote: Ok. Anthony Barrett On Oct 24, 2014, at 11:34 AM, Gregory Riches < > wrote: Can I come and see the apartment on monday afternoon? We can discuss which apartment is next at that time. Thanks, Gregory On Oct 22, 2014, at 4:37 PM, Anthony Barrett a wrote: ok will get them. Also - can we use tiles for the backsplash in 10B. MAke sure it matches the existing counter On Oct 22, 2014, at 4:32 PM, Gregory Riches wrote: Hi Anthony, I am putting together a major presentation for Jeffrey for tomorrow. I haven't had time to go to Simon's but here is an alternative from home depot. Can you pick this up? Baldwin Reserve Tube Satin Nickel Passage Lever with Contemporary Round Rose-PS.TUB.R.CRR.I50 at The Home Depot Thanks, -Gregory On Oct 22, 2014, at 3:05 PM, Anthony Barrett a wrote: EFTA00574720 Hi Gregory, I need the door handles for 10 B.. We are trying to get it done by Friday On Oct 15, 2014, at 12:06 PM, Gregory Riches wrote: Anthony, Here is a list of what we will cover today at our meeting. See you at 1:30. -Gregory Gregory Riches INTERIORS Apt 2 G -Status of kitchen renovation including new ceiling fixture -New crown moulding like 10F -New window treatment like I0F -New radiator covers like 10 F -Bath ok but could be updated like 8H Apt 3 M -New kitchen cabinets -New radiator cover in bedroom -New closets Apt 8A -New window treatment like 10F -New closet door handles -Can the radiator cover look like 10F without too much trouble? -This bathroom should be the standard for all units as the need to be renovated Apt 8 H -New kitchen cabinets Apt 10 B -New crown moulding -New trim to hide wires for cable etc. -New radiator covers -New kitchen cabinets -New window treatment -New bathroom Apt 10 F -New bath door knob -Paint ceiling in bath -New bulbs in bath fixture G-16 1/2 bulbs frosted Apt 10 N EFTA00574721 -New bleached floor finish -New kitchen -New radiator covers -New window treatment -New closets -New bathroom -New ceiling light Apt 11B -New bleached wood flooring -New crown and trim to hide wires -New radiator covers -New window treatment -New track lighting -New kitchen -New closets -New bathroom Apt 11 J -New ceiling fixtures -New window treatment Apt 11P -New crown and trim to hide wires -New radiator covers -New window treatment -New track lighting -New kitchen -New closets -New bathroom On Oct 15, 2014, at 9:46 AM, A Barrett a wrote: That is fine. Come to my office at 301 east 66 Anthony Barrett On Oct 15, 2014, at 9:41 AM, Gregory Riches <I l> wrote: Good morning Anthony, We can meet this afternoon because Jeffrey cancelled my meeting with him. How about 1:30, does that work for you? Please let me know. EFTA00574722 Thanks, Gregory Gregory Riches INTERIORS Anthony Barrett Ossa Properties. Inc. Anthony Barrett Ossa Properties, Inc. Gregory Riches INTERIORS EFTA00574723
ℹ️ Document Details
SHA-256
f1946d044fa51b1e2b1b3671351f3f4d1c0193fd7c558fe61403a5f99d521e24
Bates Number
EFTA00574720
Dataset
DataSet-9
Type
document
Pages
4

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!