EFTA00710469
EFTA00710471 DataSet-9
EFTA00710472

EFTA00710471.pdf

DataSet-9 1 page 201 words document
P17 V16 P23 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (201 words)
From: To: Jeffrey Epstein Cc: Rich Kahn Leighton Allenby a, Zorro Ranch Subject: ZDC MH PB Phase2 Date: Thu, 27 Aug 2015 16:17:29 +0000 Attachments: ZDC.PB_Grade_Stake.pdf; ZDC_MH_PB.JPG; ZDC.PB2.JPG; ZDC_PB_North_Eastem_Comer 2.JPG; ZDC_PB_North_Eastem_Comer.JPG; ZDC PB South Comer.JPG; ZDC_PB_South_Eastem Comer.JPG; ZDC.Backfill.JPG Jeffrey Attached for your reference: I: Surveyed layout with grade stakes fill (F) and cut (C) requirements 2: Photos taken from master bedroom terrace and at each corner point Please note: This layout extended another 25ft past the layout marked out during your visit. It will require more tree removal and is 9 plus feet below grade. If we are to proceed with this layout, this corner will need some sort of retaining wall constructed. this can be done with rocks and fill, but it will add to the scope of work. Septic System is out lined on sketch, should not be an issue unless we dig. We will need to change access to tanks thru dog pen as discussed. As of date we are proceeding with stock piling dirt for both MH and Log Cabin Projects Monday we will start hauling dirt to each location Please confirm if we should proceed with this layout, as per sketch. Regards Stanley, NM Ph: EFTA00710471
ℹ️ Document Details
SHA-256
f2651bd0ff42c02019b1c351fd41e6b02183baf4dc1d2f4138962cede6d069ab
Bates Number
EFTA00710471
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!