📄 Extracted Text (277 words)
From: Richard Kahn
To: "Jeffrey E." <[email protected]>
Subject: Fwd: ZDC Lodge Portal
Date: Thu, 02 Feb 2017 22:13:08 +0000
Attachments: ZM_Lodge_Portal.docx
Inline-Images: ZDC_Lodge_Portal_1.JPG; ZDC_Lodge_Portal_2.JPG; ZDC_Lodge_Portal_3.JPG
please advise if you would simply like to repair lodge decking (as quoted below), replace or possibly redesign
JJ initially built deck after damaged from snow storm 10 years ago for cost of approx 40,000
brice wanted to do work soon as he believes this may be one area used for larry's daughter wedding in June
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
tel
fa
ce
On Jan 31, 2017, at 9:45 AM, Brice Gordon <[email protected]> wrote:
Rich
Attached revised proposal for the refurbishment of the Lodge Portal.
Jose agreed to the amount of $13,500.00
regards Brice
Begin forwarded message:
From: Brice Gordon <[email protected]>
Subject: ZDC Lodge Portal
Date: January 26, 2017 at 1:54:08 PM EST
To: Rich Kahn <
Cc: Zorro Ranch <[email protected]>
Rich
attached photos for your reference and estimate to repair for your review
As discussed
EFTA00679320
The Portal at the Lodge needs some work.
The main bracing underneath the deck has collapsed.
Northern end of the deck has moved approximately 6 inches away from the main structure
The main canopy is at a 8% lean down the hill
Perviously it looked like the whole deck needed to be replaced, 50K plus Verbal estimate
Jose from Solano Builders figures he can refurbish without totally destroying deck.
4 of the 6 main up right posts will be replaced along with Roofing etc.
Estimated cost to repair $14,830.00
Propose flat price of 14k?
how do you wish to proceed.
Regards
Brice Cordon
Stanley, NM
Ph:
EFTA00679321
ℹ️ Document Details
SHA-256
f2ae47a04552dc4af05c8d9b67348ee52b6d054092ba5eeb6d2aab1558a09f3a
Bates Number
EFTA00679320
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0