📄 Extracted Text (250 words)
From: Karyna Shuliak
To: Menvin Ma Leo <M >
Subject: 301 list of work
Date: Thu, 25 Jan 2018 06:34:58 +0000
Hi Menvin and Leo,
Thank you for your time at 301 today.
Please see below the summary of work, that we discussed today.
Thank you.
10B:
-bedroom closets: install metal poles instead of the existing ones, put new light switch strings
-same color/warmth light bulbs in the hallway ceiling near the bathroom
-fix the dining table
10/%1
-shower door seal
11P:
-cover wires in the linen closet,
-put lights on dimmers where possible
-Bathroom: reseal the gap around the shower floor; shower door seal
8A:
-Entry light dimmer is not working
7J:
-fix bedroom art pictures, so that they lay flat against the wall without bending
-walk-in bedroom closet: fill the missing cedar panels, cover the phone cables
-remove rusted bar on the balcony window
-change lights in the fridge
-reattach a loose floor molding piece
2G
-put up the living room curtains after tailoring is done
-fix the dining table
-film for all the windows
-new ac covers for outside
-put a plate around the ac outlet in the living room
-hang mirrors above the bedroom nightstands (should be at the same level as in I OB bedroom)
-seal the gap around the bathtub
-shower fixture cover is dirty
-hook for the bathroom door
-missing light switches in some closets
EFTA00564344
-fix the door handle latch (coat closet)
-hide wires in the kitchen cabinets
-small fire extinguisher
EFTA00564345
ℹ️ Document Details
SHA-256
f2cf82f039a5f20b23b82debdc3a7ee78850d5accbcaed07ac402dd14fa1ec72
Bates Number
EFTA00564344
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0