EFTA00655236.pdf

DataSet-9 1 page 489 words document
P23
👁 1 💬 0
📄 Extracted Text (489 words)
From: ion nicola < To: Jeffrey Epstein <[email protected]> Subject: RE: Date: Fri, 18 Mar 2011 15:46:51 +0000 Importance Normal hi jeffrey, ..i've just remembered about the lighting in the library..on the island. probably you saw many pictures of the ceiling(sky with clouds) but its hard to notice the differences of the light on different sides of the ceiling. in fact when you get inside thru the door, the front side has very strong and cold light and the left side too. the right side and the the side with the doors are darker. probably they put different bulbs(tubes) and some are not working too. so if the sky looks too light in some parts is because the lightning. you can turn off the light see the real color which is kind if dark..but i did it that way because i of the lightning. anyway, i think the ceiling looks nice. then in the other rooms were more things i couldnt finish because they told me in the last day. with a few days before i left, brice came to me and asked me how many more days i need to finish everything because he wanted to buy my airplane ticket,.. he said i have to finish sarah's office(the doors and window) and the vestibule doors and thats it. so i told him i need like two three days for that. but then in the last day karren came and she told me i have to fix the wall in the bathroom in cabana not because they moved the rack is on top of the toillete. then another guy came in the morning telling me that i have to mach the frame of two mirrors he built for the master bathroom. then the electrician came with more switcher plates for sarah's office and he told me that i have to match those like the wall.., besides that i scheduled to do those two doors in the vestibule in last day, but then when i got there in the morning one door was not finished..then someone came and started patching and sanding the door, and then primering..and then painting... so thats why i couldnt finish both doors. anyway, i told karren when she told me about fixing the bathroom wall in cabana no 2, that i need maybe one or two days to finish everything, so i told her to cancel my flight..but then she called sarah and they decided that i probably have to come back for more touch ups..because now all the cabanas,1,2,3 are full with a lot of furniture.. so probably when they are going to move the furniture again..will going to damage the walls. but untill they are going to move the furniture..and while i am in new york, do you want me to start something at the house on 71st st or take a brake for a while? what do you think? thank you. ion EFTA00655236
ℹ️ Document Details
SHA-256
f3fe7061b8fc59bc7c5ca913eb72b6c0a8191ae88f32158c50f930617b21137b
Bates Number
EFTA00655236
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!