EFTA00583475
EFTA00583476 DataSet-9
EFTA00583477

EFTA00583476.pdf

DataSet-9 1 page 467 words document
P17 V16 P23 V11 V13
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (467 words)
Punch List — per JE directives as of March 5. 2012 1. Rug — due to ship from manufacturer 3/7 2. Flagpole bath and cabana — slipcovers for sofa and cushion week of the 27th 3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th - Floor - Doors location and fabrication -Lighting schedule 4. Grotto - JE to redo layout of steps, determine shelter height — roof for Grotto shed 5. Heli garage —final punch out (painting) 6. Heli road - extend 7. Hangar —floor sanding in progress — 401(50' area for slab, 3 foot wall around it — containment for ISO fuel tank — bathroom and room divider — subcontractor 8. Steel shed - have estimate for building, budget to be forwarded 31Jan 9. Triangle, commenced work 10. Entry tree lights, confirmed ground lighting 11. Library Dehumidification — commences week of March 12 12. Solutions for generators —drawings complete for bid package 13. Top of hill — CLEAN UP — remove rocks and hydroseed 14. Tree order — develop list 15. Tiki - Shields — check with Sarah for date - Dock box pending available time 16. Sunken garden berm - continues 17. Concrete roads at flagpole - continues 18. Concrete triangle 19. Bench placements — bench on peninsula point 20. Engineering clean up - continues 21. New vehicles — two more Polaris bikes (800's) — Larry/Brice 22. Dock decking — discuss pressure treated timber and carpeting 23. Aquarium photo — ordered for small shutters —check with Sarah for date 24. Mgrs Cottage Roof work remains — completion 2 weeks 25. Mooring Permit — proceeding with bids to place anchors 26. Electrical quotes - forward to JE 27. Rationalize Telephone system — Karen to make up extension list for each phone 28. Gates to hide engineering both at top and bottom of hill. Bill reviewing light weight gates —JE advises three 8 foot gates - bi-fold design running in track on the ground 29. Engineering service road reshaped - Continues 30. Dock lighting -Barn lights for structures, ordered due on sight 2nd week of March 31. Roads — from intersection to Flagpole 32. Guest house — moved to Beach 3, layout to be confirmed — scrape ground — lay rebar 33. Chillax room —furniture piece required for electrical/media equipment 34. Replacement transformer Mechanical building — have bid — reviewing shipping — Brice to finalize cost comparisons — refurbishment VS. new 35. Photos for Chillax bath — install small ones that are on site 36. Floating Dock — fabrication of metal beam to commence 3/6 37. Remove Rusty metal dock Columns — recovered 38. Midnight Express — new trailer to be purchased 39. Sundial — pour on 3/7 — Tom to confirm this date 40. Big Wind Door— need to be unstuck EFTA00583476
ℹ️ Document Details
SHA-256
f40b82a041013fdeac390728fd566885cbef64779153b14bf37b4d1f5fccbabc
Bates Number
EFTA00583476
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!